Gols IV
Gols IV onshore wind overview.
The Gols installation in Burgenland is the repowered wind site described by W.E.B as Gols RI. Two Vestas V150 turbines replaced three earlier turbines and entered operation on 18 January 2024; their different hub heights reflect the site’s layout.In OperationAustria
At a Glance
Declared capacity
10 MWTurbines
2Operator
Data coming soonCountry
AustriaLocation
47.932°, 16.958°Website
Official project pageOwnership
1 record| Share | Organisation | Role | Details | Period |
|---|---|---|---|---|
| 100% | ![]() | Owner Operator | W.E.B identifies Gols RI as an operating installation wholly held within its portfolio. | Current / not dated |
Organisations
2 recordsOrganisations recorded as working on this asset or its project, and their role.
| Organisation | Role | Details |
|---|---|---|
| Repowering turbine manufacturerTurbine Supply | Manufactured the two V150 turbines documented in W.E.B’s 2024 annual report. | |
| Wind-farm owner and operatorOwner Operator | Owns and operates the repowered Gols RI installation. |
Supplier registration
Contact page onlyHow suppliers get onto this project's radar: its standing register, supplier portal or contact route.
Supplier enquiries can be directed through the published corporate contact page. This is a general business contact route across the organisation’s portfolio.
W.E.B company-wide contact route, including its Gols wind installation.
SourceChecked 28 Oct 2026
Capacity history
Recorded project capacity figures. Future-dated changes are shown but are not used as current capacity.
| Effective | Capacity type | Capacity | Source |
|---|---|---|---|
| Current | Declared capacity | 10 MW | W.E.B current Austrian plant list — Gols RI declared capacity |
