Zurndorf II extension
Zurndorf II extension onshore wind overview.
This four-turbine extension to Zurndorf II comprises two ENERCON E115 turbines commissioned in 2018 and two E126 EP3 turbines commissioned in 2021. The two pairs provide 6.4 MW and 8 MW respectively. They are separate from the original seven-turbine Zurndorf II wind farm and the other Zurndorf developments.In OperationAustria
At a Glance
Capacity
14.4 MWTurbines
4Operator
Data coming soonCountry
AustriaLocation
47.944°, 16.979°Website
Official project pageOwnership
Owner data coming soon.
Organisations
3 recordsOrganisations recorded as working on this asset or its project, and their role.
| Organisation | Role | Details |
|---|---|---|
| Zurndorf II extension developerHistorical Development Context | The March 2019 municipal record identifies AVENTUM with the Zurndorf II extension, including the two E115 installations and the remaining proposed pair. | |
| Extension turbine manufacturerTurbine Supply | Manufactured the E115 and E126 EP3 turbines mapped at the four extension positions. | |
| Developer of the second extension pairDevelopment And Operation | IG Windkraft’s March 2022 industry report attributes the two E126 turbines added in 2021, totalling 8 MW, to Energie Burgenland Windkraft. |
Supplier registration
No route foundHow suppliers get onto this project's radar: its standing register, supplier portal or contact route.
The published development documents provide no dedicated supplier register. They do not offer an open procurement invitation.
No standing supplier route for the four-turbine extension is established by the published development documents.