Mottec
Mottec pumped hydro overview.
Mottec is a hydroelectric generating and pumping station in the Gougra scheme in Valais. A refurbishment programme begun in 2018 renewed generating equipment, valves, controls and electrical systems, increasing generating capacity from 69 MW to 87 MW. The modernised station was inaugurated in May 2025.In OperationSwitzerland
At a Glance
Turbine nameplate capacity
102 MWEnergy storage
Data coming soonOperator
Data coming soonCountry
SwitzerlandLocation
46.153°, 7.620°Website
Official project pageOwnership
1 record| Share | Organisation | Role | Details | Period |
|---|---|---|---|---|
| Unknown | Owner Operator | Owner and operator of the Mottec station within the Gougra scheme. | Current / not dated |
Organisations
23 recordsOrganisations recorded as working on this asset or its project, and their role.
| Organisation | Role | Details |
|---|---|---|
| Building finishing worksEpc Balance Of Plant | Alain Zufferey is listed among the companies responsible for building finishing works in the Mottec refurbishment brochure. | |
| Pelton turbine refurbishmentEquipment Supply | ANDRITZ is credited with the turbine work, including replacement Pelton runners. | |
| Historical hydraulic drive turbine manufacturerEquipment Supply | The technical brochure identifies Charmilles hydraulic turbines in the pumping arrangement, dating from 1956. | |
| Fire-protection quality assuranceEngineering And Technical | BISA is credited with quality assurance for fire protection. | |
| 65 kV switchyard and line workGrid And Transmission | FMV is credited with the 65 kV switchyard and associated lines. | |
| Gougra scheme owner and operatorOwner Operator | Forces Motrices de la Gougra owns and operates Mottec as part of the Gougra hydropower scheme in Valais. | |
| GE hydro generator replacementEquipment Supply | GE’s hydropower business, now part of GE Vernova, supplied the generators credited in the Mottec refurbishment brochure. | |
| Operation, safety and electrical engineeringOperations And Maintenance | The refurbishment account credits HYDRO Exploitation with operation and safety support, control systems and electrical power evacuation work. | |
| Building finishing worksEpc Balance Of Plant | I.B Sols is listed among the companies responsible for building finishing works in the Mottec refurbishment brochure. | |
| Civil and electromechanical engineeringEngineering And Design | IM Maggia Engineering is credited with civil and electromechanical engineering for the refurbishment. | |
| Architectural designEngineering And Design | JBC Architectes is credited with architecture for the refurbishment. | |
| Power transformer supplySubstation Electrical | Kolektor Etra is credited with power transformers for the refurbishment. | |
| Refrigeration installationsEquipment Supply | Lauber IWISA is credited with refrigeration installations. | |
| Building finishing worksEpc Balance Of Plant | LOU Carrelage is listed among the companies responsible for building finishing works in the Mottec refurbishment brochure. | |
| Building finishing worksEpc Balance Of Plant | Lourejoints is listed among the companies responsible for building finishing works in the Mottec refurbishment brochure. | |
| Civil constructionEpc Balance Of Plant | Melly Constructions is credited with civil construction work. | |
| Environmental and hazardous-material studiesConsenting Environmental | Patrick Epiney Ingénieurs is credited with environmental studies, including hazardous-material diagnostics. | |
| Building finishing worksEpc Balance Of Plant | Renotec is listed among the companies responsible for building finishing works in the Mottec refurbishment brochure. | |
| Metal constructionEpc Balance Of Plant | Revaz is credited with metal construction work. | |
| Historical storage-pump manufacturerEquipment Supply | The technical brochure identifies Sulzer as manufacturer of the storage pumps dating from 1956. The refurbishment did not replace these pumps. | |
| Building finishing worksEpc Balance Of Plant | Techmétal is listed among the companies responsible for building finishing works in the Mottec refurbishment brochure. | |
| Building finishing worksEpc Balance Of Plant | Vogel is listed among the companies responsible for building finishing works in the Mottec refurbishment brochure. | |
| Spherical valve supplyEquipment Supply | Vortex Hydra is credited with spherical valves. |
Supplier registration
Contact page onlyHow suppliers get onto this project's radar: its standing register, supplier portal or contact route.
Businesses can contact the hydropower services operator through its corporate contact page. Published contact channels provide a general route for enquiries about services and collaboration.
Portfolio-wide contact route for HYDRO Exploitation’s hydropower services.
SourceChecked 29 Oct 2026
Capacity history
Recorded project capacity figures. Future-dated changes are shown but are not used as current capacity.
| Effective | Capacity type | Capacity | Source |
|---|---|---|---|
| Current | Turbine nameplate capacity | 102 MW | Mottec technical brochure – three turbines rated at 34 MW mechanical power each |