Fortis Ersekë Solar
Fortis Ersekë Solar solar overview.
Fortis Ersekë is a consented solar development at Taç-Lartë in Albania’s Kolonjë region. The latest developer design combines photovoltaic generation with battery storage to shift electricity supply towards evening demand. The project reached ready-to-build status in September 2026, with commercial operation targeted for the final quarter of 2027.ConsentedAlbania
At a Glance
Consented capacity
62 MWMounting
GroundOperator
Data coming soonCountry
AlbaniaLocation
40.313°, 20.698°Website
Official project pageOwnership
1 record| Share | Organisation | Role | Details | Period |
|---|---|---|---|---|
| Unknown | ![]() | Developer | Fortis Energy and Construction is the Albanian development company named in the Ersekë engineering and permitting records. | Current / not dated |
Organisations
4 recordsOrganisations recorded as working on this asset or its project, and their role.
| Organisation | Role | Details |
|---|---|---|
| Project engineering and permitting adviserEngineering And Design | Blue Water Energy’s services cover land acquisition, feasibility, grid-connection studies and development permits. | |
| Albanian solar project developerDevelopment | Fortis Energy and Construction is the client named for the Ersekë engineering and permitting work. | |
![]() | Developer | Not set |
| Renewable project sponsorDevelopment And Sponsor Context | The Fortis group develops the Ersekë solar and storage project through its Albanian company. |
Equipment
2 recordsPanels and inverters recorded at this installation, with each unit's rating as its source gives it.
| Equipment | Manufacturer | Model | Units | Unit rating | Source |
|---|---|---|---|---|---|
| InvertersProposed | SG1100 RFPThe earlier 61.9 MWp engineering design specifies 45 Sungrow SG1100 RFP inverters. This design precedes the developer’s 75 MWp project configuration. | 45 | Not set | Source | |
| PanelsProposed | TSM-660DEG21C.20The earlier 61.9 MWp engineering design specifies 93,800 Trina Solar panels. This design precedes the developer’s 75 MWp project configuration. | 93,800 | Not set | Source |
Supplier registration
Contact page onlyHow suppliers get onto this project's radar: its standing register, supplier portal or contact route.
Suppliers and contractors can submit enquiries about construction and procurement packages. Engagement is through the developer’s general enquiry route.
The developer’s project-specific invitation directs interested suppliers to make enquiries; its company contact route serves the wider Fortis business.
SourceChecked 28 Oct 2026
Capacity history
Recorded project capacity figures. Future-dated changes are shown but are not used as current capacity.
| Effective | Capacity type | Capacity | Source |
|---|---|---|---|
| 1 Sept 2026 | Technical capacity | 75 MW | Fortis Energy — solar PV capacity in MWp DC |
| 25 Jun 2025 | Consented capacity | 62 MW | Council of Ministers of Albania |