Gletschersolar Matterhorn
Gletschersolar Matterhorn solar overview.
Gletschersolar Matterhorn is a proposed high-alpine solar installation near Trockener Steg above Zermatt. Its raised photovoltaic structures are designed for heavy snow and wind loads, with connections planned through the existing local electricity network. The proposal is progressing through the permitting process.PlanningSwitzerland
At a Glance
Capacity
Data coming soonMounting
GroundOperator
Data coming soonCountry
SwitzerlandLocation
45.971°, 7.720°Website
Official project pageOwnership
3 records| Share | Organisation | Role | Details | Period |
|---|---|---|---|---|
| Unknown | Co Developer | A development partner in the proposed Gletschersolar Matterhorn installation. | Current / not dated | |
| Unknown | ![]() | Co Developer | A development partner in the proposed Gletschersolar Matterhorn installation. | Current / not dated |
| Unknown | ![]() | Co Developer | A development partner in the proposed Gletschersolar Matterhorn installation. | Current / not dated |
Organisations
6 recordsOrganisations recorded as working on this asset or its project, and their role.
| Organisation | Role | Details |
|---|---|---|
| Solar development partnerDevelopment | Co-develops the high-alpine solar proposal at Trockener Steg with the local project partners. | |
| Temporary logistics and mitigation land accessLease Award And Site Control | Approved temporary use of parcels in Findelbach and Schweigmatten for intermediate storage, transfer areas and planned environmental mitigation on 26 February 2025. | |
| Installation-site landownerLease Award And Site Control | Cooperates in the solar proposal as landowner of the proposed installation site. | |
| Solar development partnerDevelopment | Co-develops the high-alpine solar proposal at Trockener Steg with the local project partners. | |
| Alpine photovoltaic engineering consultantEngineering And Design | Assessed suitable terrain and supported solar-table structural design and the building application for Axpo, addressing snow, wind and avalanche constraints. | |
| Solar development partnerDevelopment | Co-develops the high-alpine solar proposal at Trockener Steg with the local project partners. |
Supplier registration
Contact page onlyHow suppliers get onto this project's radar: its standing register, supplier portal or contact route.
Businesses can use the local development partner’s general corporate contact channel. Enquiries can identify the installation and request the appropriate purchasing contact.
EWZ Elektrizitätswerk Zermatt’s general corporate contact channel; enquiries may identify Gletschersolar Matterhorn, but the channel is not a project-specific supplier register.
SourceChecked 30 Oct 2026

