Huatacondo is a solar power plant in the Tarapacá Region of northern Chile. Full operation began in September 2019. The Coordinador Eléctrico Nacional’s report for 27 October 2026 records the solar plant and its battery extension as disconnected with zero availability, citing a reported cyberattack. A February 2020 technical study documents 47 ABB PVS980 inverters at the solar plant.In OperationChile
At a Glance
Technical capacity
98 MWMounting
GroundOperator
Data coming soonCountry
ChileLocation
-21.136°, -69.465°Website
Official project pageOwnership
3 records| Share | Organisation | Role | Details | Period |
|---|---|---|---|---|
| Unknown | ![]() | Investor | Eiffage’s July 2017 financing announcement identifies Eiffage as an equity participant in the Huatacondo solar project. | Current / not dated |
| Unknown | ![]() | Investor | Eiffage’s July 2017 financing announcement identifies Shikoku Electric Power Co., Inc. as an equity participant in the Huatacondo solar project. | Current / not dated |
| Unknown | ![]() | Investor | Eiffage’s July 2017 financing announcement identifies Sojitz Corporation as an equity participant in the Huatacondo solar project. | Current / not dated |
Organisations
9 recordsOrganisations recorded as working on this asset or its project, and their role.
| Organisation | Role | Details |
|---|---|---|
| Original solar developmentHistorical Development Context | AustriaEnergy identifies Huatacondo as a developed solar project subsequently sold to Sojitz. | |
AUSTRIANSOLAR CHILE CUATRO SPA | Operator | Not set |
| Solar project co-developerDevelopment | Eiffage participated in the development of the Huatacondo solar project alongside the other consortium partners. | |
| Solar project development and deliveryDevelopment | Eiffage Concessions participated with Eiffage Energía in delivery of the Huatacondo solar project. | |
| Solar EPC and maintenance contractorEpc Balance Of Plant | Eiffage’s July 2017 announcement identifies Eiffage Energía as the solar plant’s construction contractor with a 30-year maintenance contract. | |
| Minimum technical output studyTechnical Advisory | I-SEP Ingenieros SpA prepared the Huatacondo minimum technical output study for Eiffage; revision 0 is dated 13 February 2020. | |
| Construction and maintenance technical supervisionTechnical Advisory | Shikoku Electric Power identifies technical supervision of construction and operation and maintenance among its roles at Huatacondo. | |
| Solar project co-developerDevelopment | Shikoku Electric Power Co., Inc. participated in the development of the Huatacondo solar project alongside the other consortium partners. | |
| Solar project co-developerDevelopment | Sojitz Corporation participated in the development of the Huatacondo solar project alongside the other consortium partners. |
Equipment
1 recordPanels and inverters recorded at this installation, with each unit's rating as its source gives it.
| Equipment | Manufacturer | Model | Units | Unit rating | Source |
|---|---|---|---|---|---|
| Inverters | PVS980-58-2091kVA-LThe February 2020 technical study documents 47 ABB PVS980-58-2091kVA-L inverters, each with 2.091 MW nominal active power. The group describes the equipment recorded in that study. | 47 | 2.09 MWAC rated | Source13 Feb 2020 |
Capacity history
Recorded project capacity figures. Future-dated changes are shown but are not used as current capacity.
| Effective | Capacity type | Capacity | Source |
|---|---|---|---|
| Current | Technical capacity | 98 MW | AustriaEnergy: solar generating rating of 98 MW AC |