Market stage
Active market with a track record of projects and visible policy support.
Active market with a track record of projects and visible policy support.
Typical offshore wind consenting timescale: 29-58 months.
Single Electricity Market (SEM) shared with Northern Ireland. EirGrid (Republic) and SONI (NI) are TSOs. CRU (Commission for Regulation of Utilities) regulates. MARA (Maritime Area Regulatory Authority) established 2023 to manage offshore Maritime Area Consents (MACs). ORESS (Offshore Renewable Energy Support Scheme) auction mechanism. Grid reinforcement via North-South interconnector.
EirGrid manages offshore grid connection in Ireland as TSO, with a grid connection offer required as a precondition for eligibility under the ORESS offshore tender scheme. Grid capacity in the Irish system is constrained by its small size and island geography, and connection offer management is a known risk for the offshore pipeline. Reinforcement at onshore landing points on the east and west coasts is a live planning consideration.