Market stage
Highly active market with a strong pipeline, established delivery model, and repeat projects.
Highly active market with a strong pipeline, established delivery model, and repeat projects.
Typical offshore wind consenting timescale: 29-58 months.
Semi-liberalised market. Taipower (Taiwan Power Company) is dominant utility, TSO and market operator. Bureau of Energy (BOE/MOEABOE) manages offshore leasing via Zonal Allocation Planning (ZAP) rounds. EIA via Environmental Protection Administration. Local content requirements historically stringent (R2/R3) — WTO dispute with EU led to removal for R3.3+. CfD equivalent (IPPAP) provides revenue support. Grid connection sequencing is documented critical path.
Grid connection is managed by Taiwan Power Company (Taipower) as the state-owned utility and TSO, with connection capacity allocation tied to the ZAP (Zonal Allocation Planning) process managed by MOEABOE. Taipower is responsible for onshore grid reinforcement and substation capacity at designated landing points, and grid absorption constraints have been a documented bottleneck in R2 and R3, contributing to project delays. Grid connection sequencing is the most consistently cited cause of delay in the Taiwanese offshore wind programme.