| In Operation | Non Operating Owner · 12.45%Burbo Bank Extension | Ownership | The Crown Estate lists Brookfield as a 12.45% owner of Burbo Bank Extension as at 31 December 2024. Brookfield acquired the minority stake from Orsted as part of the 2024 four-asset UK offshore wind portfolio transaction. |
| In Operation | Non Operating Owner · 12.45%Hornsea Project One | Ownership | Brookfield is a direct non-operating co-owner following the 2024 transaction with Orsted. |
| In Operation | Non Operating Owner · 12.45%Hornsea Project Two | Ownership | Brookfield is a direct non-operating co-owner following the 2024 transaction with Orsted. |
| In Operation | Non Operating Owner · 12.45%Walney Extension | Ownership | The Crown Estate lists Brookfield as a 12.45% owner of Walney Extension as at 31 December 2024. |
| In Operation | Investor | Onshore grid assets | Burbo Bank · Intermediate Connection Asset |
| In Operation | Investor | Onshore grid assets | Burbo Bank · Final Grid Connection Point |
| In Operation | Owner | Onshore grid assets | Hornsea Project Two · Intermediate Connection Asset |
| In Operation | Owner | Onshore grid assets | Hornsea Project Two · Final Grid Connection Point |
| In Operation | Owner | Onshore grid assets | Walney Extension · Final Grid Connection Point |
| In Operation | Owner | Onshore grid assets | Walney Extension · Intermediate Connection Asset |