| Development | Participating energy group at the 2019 openingBruckneudorf | Historical Development Context | Historical energy group participation documented at the 2019 opening. |
| In Operation | Wind-site developer and operating groupDeutschkreutz | Development And Operation | Deutschkreutz wind repowering within the wider wind and photovoltaic hybrid site |
| In Operation | Wind farm development groupNickelsdorf 1 | Development And Asset Management | Nickelsdorf 1 |
| In Construction | Extension developer in 2020Nickelsdorf Erweiterung | Development | Three-turbine extension announced in June 2020 |
| In Operation | Operator of the Enercon E70 sectionZurndorf | Development And Operation | The three Enercon E70 turbines covered by the 2025 assessment |
| In Operation | DeveloperDeutschkreutz | Onshore wind | Deutschkreutz |
| In Operation | Indirect ParentNickelsdorf 1 | Onshore wind | Nickelsdorf 1 |