| In Construction | Foundation fabricatorAnholt | Foundations | 111 monopiles and 111 transition pieces |
| In Construction | Offshore substation fabricatorAnholt | Substation Electrical | 400 MW offshore substation structure and topside |
| In Construction | Offshore substation design, fabrication and installation contractorArcadis Ost 1 | Substation Electrical | Complete Arcadis Ost 1 offshore substation |
| In Construction | Monopile and transition piece supplierArkona | Foundations | 60 monopile foundations and 60 transition pieces |
| In Construction | Offshore substation EPCI consortium contractorBaltic Power | Substation Electrical | Baltic Power offshore substations |
| In Construction | Foundation fabrication customer and jacket fabricatorBeatrice | Foundations | Beatrice jacket foundation fabrication supply chain |
| In Construction | Foundation fabricatorBorkum Riffgrund I | Foundations | Monopiles, transition pieces and suction bucket jacket prototype |
| In Construction | Monopile and transition-piece fabricatorBorkum Riffgrund I | Foundations | 77 monopiles and 77 transition pieces |
| In Construction | Offshore substation construction partnerBorkum Riffgrund I | Substation Electrical | 450 MW Borkum Riffgrund 1 offshore substation |
| In Construction | Offshore substation construction partnerBorkum Riffgrund I | Substation Electrical | 3,500 tonne offshore substation platform |
| In Construction | Suction bucket jacket prototype fabricatorBorkum Riffgrund I | Foundations | One 850 tonne suction bucket jacket prototype |
| In Construction | XXL monopile foundation supplierBorkum Riffgrund III | Foundations | Borkum Riffgrund 3 and Gode Wind 3 monopile package |
| In Construction | Transition-piece supplierBorssele I and II | Foundations | 59 transition pieces for Borssele 1 and 2 |
| In Construction | Turbine tower supplierBurbo Bank | Foundations | Burbo Bank turbine towers |
| In Construction | Transition piece supplier and project managerBurbo Bank Extension | Foundations | 32 transition pieces |
| In Construction | Foundation fabrication supplierButendiek | Foundations | Monopile and transition piece fabrication supply chain |
| In Construction | Transition piece fabricatorCalvados | Foundations | Calvados 64 transition pieces |
| In Construction | Offshore substation component manufacturerCVOW Commercial | Substation Electrical | Three offshore substations for CVOW Commercial |
| In Construction | Transition piece manufacturerCVOW Commercial | Foundation Supply | 176 transition pieces for CVOW Commercial |
| In Construction | Mono Bucket foundation fabricatorDeutsche Bucht | Foundations | Two Mono Bucket pilot foundations |
| In Construction | Jacket foundation fabricatorEnBW Baltic 2 | Foundations | 41 jacket foundations for deeper-water Baltic 2 turbine locations |
| In Construction | Foundation and transition-piece fabricatorGode Wind I | Foundations | 55 Gode Wind I transition pieces within the 97-foundation Gode Wind I and II package |
| In Construction | Foundation and transition-piece fabricatorGode Wind II | Foundations | 42 Gode Wind II transition pieces within the 97-foundation Gode Wind I and II package |
| In Construction | XXL monopile foundation supplierGode Wind 3 | Foundations | Gode Wind III and Borkum Riffgrund 3 monopile foundation package |
| In Construction | Local wind turbine tower supply partnerGreater Changhua 1 - South East | Turbine Supply | Locally supplied wind turbine towers for Greater Changhua 1 & 2a |
| In Construction | Wind turbine tower supplierGreater Changhua 2a - South West | Turbine Supply | Locally supplied wind turbine towers for Greater Changhua 1 & 2a |
| In Construction | Offshore substation superstructure fabricatorGunfleet Sands 1 | Substation Electrical | Gunfleet Sands offshore monopile substation superstructure |
| In Construction | Offshore substation superstructure fabricatorGunfleet Sands 2 | Substation Electrical | Gunfleet Sands offshore monopile substation superstructure |
| In Construction | Foundation fabricatorGunfleet Sands 3 Demonstration | Foundations | Two transition pieces and monopile foundation components |
| In Construction | Transition piece fabricator and foundation logistics providerGwynt y Môr | Foundations | 160 transition pieces with secondary steel and transport of foundations to the UK |
| In Construction | Foundation supplierHorns Rev 2 | Foundations | Horns Rev 2 foundation package |
| In Construction | Transition piece outfitting contractorHorns Rev 3 | Foundations | 24 transition pieces |
| In Construction | Transition piece fabricatorHornsea Project One | Foundations | 96 transition pieces for Hornsea Project One |
| In Construction | Transition piece fabricatorHornsea Project Two | Foundations | 135 transition pieces for Hornsea Two |
| In Construction | Wind turbine tower supplierJeonnam 1 | Turbine Supply | 10 MW turbine towers for Jeonnam 1 |
| In Construction | Foundation fabricatorKaskasi | Foundations | 39 monopiles, 38 transition pieces and special offshore-substation transition piece |
| In Construction | Offshore substation fabricatorKaskasi | Substation Electrical | Kaskasi offshore substation topside and foundation |
| In Construction | Transition-piece fabricatorKriegers Flak | Foundations | 72 transition pieces |
| In Construction | Offshore substation manufacturer and electrical installation partyLillgrund | Substation Electrical | Lillgrund offshore substation |
| In Construction | Transition piece fabricatorLondon Array | Foundations | Transition pieces for London Array foundations |
| In Construction | Offshore substation topside fabrication customerNobelwind | Substation Electrical | Bligh Bank 2 offshore substation topside |
| Consented | Transition piece supplierNordlicht I | Foundations | Nordlicht transition pieces connecting turbines to monopiles |
| Consented | Transition piece supplyNordlicht II | Foundations | Nordlicht II offshore wind project |
| In Construction | Offshore substation EPCI consortium partnerNordsee One Offshore | Substation Electrical | 2,150 tonne offshore substation with two transformers |
| In Construction | Offshore substation platform designer and fabricatorNordsee Ost | Substation Electrical | Nordsee Ost 1,800-tonne offshore substation platform |
| In Construction | Monopile and transition-piece fabricatorNorthwester 2 | Foundations | 23 turbine foundations and one substation foundation |
| In Construction | Offshore substation EPCI contractor and topside fabricatorNorthwester 2 | Substation Electrical | Northwester 2 offshore substation and substation foundation |
| In Construction | Offshore substation topside builderNorthwind | Substation Electrical | Northwind offshore high-voltage substation topside |
| In Construction | Offshore substation customer/fabrication counterpartyNysted Offshore | Substation Electrical | Nysted offshore substation |
| In Construction | Offshore substation topside supplierPrinses Amalia | Substation Electrical | Offshore high-voltage station topside |
| In Construction | Offshore substation customer and structural supplierRødsand II | Substation Electrical | Rødsand II offshore substation topside |
| In Operation | Offshore substation supplierSandbank | Substation Electrical | Sandbank original construction programme |
| In Construction | Transition piece fabricatorVeja Mate | Foundations | 67 transition pieces |
| In Construction | Offshore substation EPC consortium partnerVineyard Wind 1 | Substation Electrical | Vineyard Wind 1 offshore substation topside and jacket |
| In Construction | Offshore substation platform construction contractorWalney Phase 1 | Substation Electrical | Walney 1 offshore substation platform steel structure |
| In Construction | Transition piece fabricatorWalney Extension | Foundations | Transition pieces for Walney 3 and Walney 4 foundations |
| In Construction | Foundation fabricatorWestermost Rough | Foundations | Monopiles and transition pieces loaded out from Aalborg |
| In Construction | Jacket foundation fabricatorWikinger Offshore | Foundations | 41 turbine jackets |
| In Construction | Jacket foundation fabrication partnerXidao | Foundations | 62 jacket foundations for Changfang and Xidao |
| In Operation | Other | Onshore grid assets | Nordsee Ost · Final Grid Connection Point |
| In Operation | Other | Onshore grid assets | Nordsee Ost · Onshore Conversion |
| In Operation | Other | Onshore grid assets | Nysted Offshore · Final Grid Connection Point |