| Planned | Transmission-system operator for connection planningLiivi 2 | Grid Connection | Liivi 1 and Liivi 2 shared export-cable and onshore grid-interface alternatives |
| Consented | Transmission-grid development contextSaare | Grid And Transmission | Saare |
| Dormant | Grid connection technical conditionsSunly SW1 | Grid Connection | SW1 application submitted in April 2022 |
| Dormant | Historical grid-connection technical-conditions issuerSunly SW10 | Grid Connection | Technical conditions for the SW5–SW10 proposals |
| Planned | Historical grid-connection technical conditions providerSunly SW8 | Grid Connection | Sunly’s SW5–SW10 offshore proposals, including SW8 |