| In Operation | Major-component maintenance and localization programme leadFuqing Xinghua Bay - Phase 1 | Operations Maintenance | Y14 prototype turbine main-bearing replacement and major-component maintenance |
| In Operation | Owner for navigation-safety filings and operating safety planFuqing Xinghua Bay - Phase 1 | Consenting Environmental | Phase 1 navigation-safety technical parameter filing and operating-period safety plan |
| In Operation | Owner for phase 1 110 kV onshore booster and export systemFuqing Xinghua Bay - Phase 1 | Substation Electrical | One 110 kV onshore prefabricated booster station and one 110 kV temporary booster-station export line |
| In Construction | Owner's multi-OEM prototype turbine programmeFuqing Xinghua Bay - Phase 1 | Turbine Supply | 14 turbines from eight domestic and international OEMs, 5 MW to 6.7 MW class |
| In Operation | Project company and operatorFuqing Xinghua Bay - Phase 1 | Operations Maintenance | 77.4 MW Fuqing Xinghua Bay phase 1 prototype test wind farm |
| In Operation | Operating companyFuqing Xinghua Bay - Phase 2 | Operations Maintenance | Fuqing Xinghua Bay offshore wind farm operations |
| In Operation | Owner for 220 kV offshore substation and export systemFuqing Xinghua Bay - Phase 2 | Substation Electrical | One 220 kV offshore substation, 35 kV array cables and 220 kV export cable route |
| In Operation | Owner for 35 kV array and 220 kV export cable systemsFuqing Xinghua Bay - Phase 2 | Cables | 10 circuits of 35 kV array cable and one double-circuit 220 kV export cable route |
| In Operation | Owner's turbine fleet specification referenceFuqing Xinghua Bay - Phase 2 | Turbine Supply | 45-turbine Fuqing Xinghua Bay phase 2 fleet |
| In Construction | Project investor and construction ownerFuqing Xinghua Bay - Phase 2 | Development And Sponsor Context | Fuqing Xinghua Bay phase 2 280 MW offshore wind farm |
| In Operation | Owner · 100%Fuqing Xinghua Bay - Phase 1 | Ownership | Ownership relationship |