| In Construction | Cable installation leadArklow Bank | Cables | Onshore cable, undersea turbine interconnecting cables and undersea cable to shore |
| Planned | Co-developer and demonstration technology sponsorArklow Bank | Development | 25 MW Arklow Bank Phase 1 demonstration project |
| In Construction | Monopile foundation installation leadArklow Bank | Foundations | Seven steel monopile foundations and transition pieces |
| In Operation | Operations and maintenance providerArklow Bank | Operations Maintenance | Arklow Bank Phase 1 turbines and O&M station |
| In Construction | Project builder and installerArklow Bank | Epc Balance Of Plant | Arklow Bank Phase 1 construction and commissioning |
| In Operation | Remote operations and reliability monitoring developerArklow Bank | Digital Monitoring | Arklow Bank offshore turbine reliability and maintenance monitoring |
| In Construction | Wind turbine supplierArklow Bank | Turbine Supply | Seven GE Wind Energy 3.6s offshore turbines |
| In Operation | Operating phase turbine supplierBac Lieu Province Wind Power Plant | Turbine Supply | 62 GE Vernova 1.6-82.5 turbines across the 99.2 MW operating phases |
| In Operation | Wind turbine supplierBac Lieu – Phase 2 | Turbine Supply | Bac Lieu Phase 2 – 52 GE 1.6-82.5 turbines |
| In Construction | Phase one wind turbine supplier and O&M services providerBac Lieu Province Wind Power Plant | Turbine Supply | 10 GE 1.6-82.5 turbines for the 16 MW first phase |
| In Construction | Haliade demonstration turbine supplierBelwind | Turbine Supply | One 6 MW Haliade 150 demonstration turbine at Belwind |
| In Construction | Haliade demonstration turbine supplierBelwind Haliade Demonstration | Turbine Supply | One 6 MW Haliade 150 demonstration turbine at Belwind |
| In Construction | Offshore wind turbine supplierBlock Island Wind Farm | Turbine Supply | Five Haliade 150-6 MW turbines totaling 30 MW |
| In Construction | High-voltage electrical equipment and protection-control systems contractorCalvados | Substation Electrical | Calvados offshore electrical substation |
| In Operation | Evacuation substation upgrade contractorCoo | Substation Electrical | Substation contract announced in June 2021. |
| In Operation | Pump-turbine unit replacementDinorwig | Equipment Supply | Scope not set |
| In Construction | Wind turbine generator supplierDogger Bank A | Turbine Supply | 95 Haliade-X 13 MW turbines for Dogger Bank A |
| In Construction | Haliade-X 13 MW wind turbine supplier and service providerDogger Bank B | Turbine Supply | 95 Haliade-X 13 MW turbines for Dogger Bank B |
| In Construction | Haliade-X 14 MW wind turbine supplierDogger Bank C | Turbine Supply | 87 Haliade-X 14 MW turbines for Dogger Bank C |
| In Construction | Onshore substation and electrical system contractor through GE-Bond consortiumEmpire Wind 1 | Substation Electrical | Empire Wind onshore substation and electrical system |
| In Construction | Turnkey offshore substation contractorEnBW Baltic 2 | Substation Electrical | AC offshore substation platform and electrical components |
| In Construction | High-voltage electrical equipment contractorFécamp Offshore | Substation Electrical | Fécamp offshore substation electrical systems |
| In Construction | Prototype turbine supplier within multi-OEM test fleetFuqing Xinghua Bay - Phase 1 | Turbine Supply | GE, Goldwind, Shanghai Electric and MingYang prototype turbines in the phase 1 test fleet |
| In Construction | Onshore substation manufacturing, installation and commissioning contractorGalloper | Substation Electrical | Galloper onshore substation and grid connection electrical systems |
| In Construction | Turbine supplier and general contractorGattendorf Nord II | Epc Balance Of Plant | Gattendorf Nord II wind farm |
| Consented | Pre-construction project owner and developerGunfleet Sands 1 | Development | Gunfleet Sands 1 consented project |
| Consented | Pre-construction project owner and developerGunfleet Sands 2 | Development | Gunfleet Sands 1 consented project |
| Consented | HVDC system contractorIJmuiden Ver Beta | Substation Electrical | IJmuiden Ver Beta offshore HVDC converter platform and Maasvlakte cluster grid system |
| Dormant | Prototype decommissioning programmeLe Carnet | Decommissioning Context | Le Carnet turbine removal and site restoration |
| In Construction | Hydropower technology and handoverLimmern | Equipment Supply | Original Limmern development |
| In Construction | Turnkey offshore substation contractorMeerwind Süd / Ost | Substation Electrical | Meerwind offshore substation platform and electrical systems |
| In Construction | Former equity sponsorMerkur Offshore | Finance Insurance Legal | 6.25% pre-sale shareholder interest in Merkur Offshore GmbH |
| In Operation | Turbine service and maintenance providerMerkur Offshore | Operations Maintenance | 10-year turbine operations and maintenance agreement |
| In Construction | Turbine supplierMerkur Offshore | Turbine Supply | 66 Haliade 150-6 MW offshore wind turbines |
| In Operation | Repowering turbine technologyMönchhof | Turbine Supply Context | GE turbine technology specified for the combined 2019 repowering scheme |
| In Operation | GE hydro generator replacementMottec | Equipment Supply | Mottec refurbishment programme documented in 2025 |
| In Operation | Hydroelectric machinery and warranty supportNant de Drance | Equipment Supply | Nant de Drance pumped-storage power station |
| In Construction | Electrical substation supplier and designerNeart na Gaoithe | Substation Electrical | Two offshore substations, onshore substation and electrical design work |
| Consented | Wind equipment supplier earmarked under 2017 development agreementPhu-Cuong | Other | 800 MW Phu Cuong Wind Farm development agreement |
| In Construction | Medium- and high-voltage equipment supplierSaint-Brieuc | Substation Electrical | Offshore substation MV/HV equipment |
| In Construction | Offshore substation high-voltage equipment contractorSaint-Nazaire | Substation Electrical | High-voltage electrical equipment and protection/control systems |
| In Construction | Wind turbine supplierSaint-Nazaire | Turbine Supply | 80 Haliade 150-6 MW offshore wind turbines |
| In Construction | Electrical infrastructure and substation contractorSheringham Shoal | Substation Electrical | Onshore substation, two offshore substations and electrical system infrastructure |
| In Operation | HVDC transmission system consortium leadSofia | Substation Electrical | Offshore converter platform and onshore converter station HVDC system |
| In Operation | Power conversion, controls and integrationSupernode Battery (Stage 1) | Equipment Supply | Supernode Stage 1 technology delivery |
| In Operation | Battery system integrationSupernode Battery (Stage 2) | Equipment Supply | Supernode Stage 2 |
| Decommissioned | Enron Wind 70/1500 / GE 1.5s turbine supplier contextUtgrunden I | Turbine Supply | Seven 1.5 MW turbines |
| In Construction | Haliade-X wind turbine supplierVineyard Wind 1 | Turbine Supply | 62 Haliade-X turbines rated at 13 MW each |
| In Construction | SCADA system supplierWalney Extension | Substation Electrical | OFTO station control and protection system |
| In Construction | Offshore and onshore switchgear and filter supplierWest of Duddon Sands | Substation Electrical | Offshore 170 kV GIS switchgear; onshore 170 kV GIS switchgear and harmonic filters |
| In Construction | Onshore switchgear and harmonic filter supplierWestermost Rough | Substation Electrical | 170 kV GIS switchgear, 150 kV harmonic filter and 275 kV harmonic filter |
| In Construction | Nearshore turbine supplierWindplanblauw | Turbine Supply | 24 GE Cypress 5.5 MW turbines in the IJsselmeer |
| In Construction | Onshore substation designer and builderYunlin | Substation Electrical | Two 320 MW onshore substations at Taixi and Sihu for Yunlin |
| Decommissioned | Indirect Parent · 100%Arklow Bank | Ownership | GE Vernova owns the original Arklow Bank Phase 1 project through Arklow Energy Limited. The wind farm has reached the end of its operational life and is the subject of a decommissioning planning application. |
| In Operation | Other | Onshore grid assets | Dogger Bank C · Onshore Conversion |
| In Operation | Other | Onshore grid assets | Dogger Bank C · Final Grid Connection Point |
| In Operation | Other | Onshore grid assets | Merkur Offshore · Onshore Conversion |
| In Operation | Other | Onshore grid assets | Merkur Offshore · Final Grid Connection Point |
| In Operation | Other | Onshore grid assets | Saint-Nazaire · Final Grid Connection Point |
| In Operation | OperatorThuận Nhiên Phong | Onshore wind | Thuận Nhiên Phong |