| Planned | Offshore substation technology partnerAura Sul | Substation Electrical | Aura Sul Wind demonstration project |
| Consented | Electrical systems infrastructure contractorBałtyk 2 | Substation Electrical | Electrical system design, controls, telecoms, HV equipment and onshore substation scope |
| Consented | Electrical systems infrastructure contractorBałtyk 3 | Substation Electrical | Electrical system design, controls, telecoms, HV equipment and onshore substation scope |
| In Operation | HVDC grid connection system supplierBard Offshore 1 | Substation Electrical | BorWin1 offshore converter, sea and land cable systems and onshore converter |
| In Construction | DolWin5 HVDC commissioning consortium participantBorkum Riffgrund III | Substation Electrical | DolWin5 converter and high-voltage systems supporting Borkum Riffgrund 3 grid export |
| Planned | HVDC technology consortium contractorCentre Manche 2 | Substation Electrical | Shared RTE contract covering Centre Manche 1, Centre Manche 2 and Oléron |
| In Operation | Grid-forming energy storage technology platformDalrymple BESS | Equipment Supply | Technology application described in the supplier’s 2024 presentation; this is not a new delivery or replacement contract. |
| In Construction | HVDC converter technology supplierDogger Bank A | Substation Electrical | Dogger Bank A HVDC Light transmission system |
| In Construction | HVDC converter technology supplierDogger Bank B | Substation Electrical | Dogger Bank B offshore HVDC system and onshore converter equipment |
| In Construction | HVDC converter technology supplierDogger Bank C | Substation Electrical | Dogger Bank C offshore HVDC system and onshore converter equipment |
| Consented | Conditional high-voltage equipment partnerGalene | Substation Electrical | Scope not set |
| Consented | High-voltage system FEED partnerGreen Volt | Substation Electrical | High-voltage system concepts for power to grid and oil and gas assets |
| In Construction | HVDC converter systems supplierHornsea Project Three | Substation Electrical | Two HVDC Light converter systems and four converter stations for Hornsea 3 |
| Consented | HVDC converter technology contractorIJmuiden Ver Alpha | Substation Electrical | IJmuiden Ver Alpha 2 GW HVDC offshore grid connection |
| In Construction | Substation and main transformer contractorPori-Tahkoluoto | Substation Electrical | Tahkoluoto substation and main transformers |
| In Operation | Shared Tierfehd substation automationTierfehd Umwälzwerk | Substation Electrical | Shared Tierfehd substation and Linth-Limmern power plants |
| In Operation | Power conversion and long-term serviceUlinda Park Battery | Substation Electrical | Scope not set |
| In Operation | Power conversion delivery and maintenanceWaratah Super Battery | Substation Electrical | Scope not set |
| In Operation | Other | Onshore grid assets | Dogger Bank C · Onshore Conversion |
| In Operation | Other | Onshore grid assets | Dogger Bank C · Final Grid Connection Point |
| In Operation | OtherPumpspeicherkraftwerk Erzhausen | Pumped hydro | Pumpspeicherkraftwerk Erzhausen |