| In Construction | Construction and commissioning milestone referenceJSGX Dafeng H1 | Reference Data | Jiangsu Guoxin Dafeng 850 MW offshore wind project |
| In Construction | Developer and controlling project sponsorJSGX Dafeng H1 | Development | JSGX Dafeng H1 within the Jiangsu Guoxin Dafeng 850 MW offshore wind project |
| In Construction | Owner-side offshore substation and export-system referenceJSGX Dafeng H1 | Grid And Transmission | Two new 220 kV offshore substations, one existing offshore substation, four 220 kV export cables and onshore switching station |
| In Construction | Project company and operatorJSGX Dafeng H1 | Project Company And Development | Jiangsu Dafeng H1 offshore wind farm |
| In Construction | Developer and controlling project sponsorJSGX Dafeng H10 | Development | JSGX Dafeng H10 within the Jiangsu Guoxin Dafeng 850 MW offshore wind project |
| In Operation | Full-capacity grid-connection referenceJSGX Dafeng H10 | Reference Data | JSGX Dafeng H10 capacity and status |
| In Construction | Full-project grid-connection milestone referenceJSGX Dafeng H10 | Reference Data | Jiangsu Guoxin Dafeng 850 MW offshore wind project |
| In Construction | Owner-side H10 export and offshore substation connection referenceJSGX Dafeng H10 | Grid And Transmission | H10 export cable, existing H5-2 offshore substation connection and onshore switching station export system |
| In Construction | Developer and controlling project sponsorJSGX Dafeng H16 | Development | JSGX Dafeng H16 within the Jiangsu Guoxin Dafeng 850 MW offshore wind project |
| In Construction | Full-project grid-connection milestone referenceJSGX Dafeng H16 | Reference Data | Jiangsu Guoxin Dafeng 850 MW offshore wind project |
| In Operation | Operational projectJSGX Dafeng H16 | Reference Data | JSGX Dafeng H16 capacity and status |
| In Construction | Owner-side H16 export and grid-connection referenceJSGX Dafeng H16 | Grid And Transmission | H16 220 kV export cable, offshore substation and onshore switching station export system |
| In Construction | Owner-side H16 offshore substation topside package referenceJSGX Dafeng H16 | Substation Electrical | H16 200 MW / 220 kV offshore substation topside fabrication, loading, transport, installation and commissioning package |
| In Construction | Developer and controlling project sponsorJSGX Dafeng H2 | Development | JSGX Dafeng H2 within the Jiangsu Guoxin Dafeng 850 MW offshore wind project |
| In Operation | Full-development grid-connection referenceJSGX Dafeng H2 | Reference Data | JSGX Dafeng H2 capacity and status |
| In Construction | Full-project grid-connection milestone referenceJSGX Dafeng H2 | Reference Data | Jiangsu Guoxin Dafeng 850 MW offshore wind project |
| In Construction | Owner-side H2 offshore substation and export-system referenceJSGX Dafeng H2 | Grid And Transmission | H2 export cable, H1/H2 offshore substation topside and onshore switching station export system |
| In Operation | Development investorLiyang Pumped Storage Power Station | Development And Finance | Liyang pumped-storage station |
| In Operation | Controlling corporate investorShahe Pumped Storage Power Station | Development And Finance | Corporate interest in the station operating company |
| Planned | Lead development partnerSheyang North District H1# | Project Development | Sheyang North District H1# |
| Consented | Lead development sponsorYancheng Dafeng H19 | Project Development | Yancheng Dafeng H19 offshore wind project |
| Consented | Majority project-company shareholderYancheng Dongtai H4 | Development And Sponsor Context | Dongtai H4 and H6 project company |
| In Operation | Owner · 10%CTG Dafeng H17 | Ownership | Ownership relationship |
| In Operation | Owner · 40%Datang Jiangsu Binhai | Ownership | Jiangsu Guoxin Group transferred its 40% interest in Datang Guoxin Binhai Offshore Windpower Co., Ltd. to Jiangsu New Energy Development Co., Ltd. in November 2021. |
| In Operation | Owner · 51%JSGX Dafeng H1 | Ownership | Ownership relationship |
| In Operation | Owner · 51%JSGX Dafeng H10 | Ownership | Ownership relationship |
| In Operation | Owner · 51%JSGX Dafeng H16 | Ownership | Ownership relationship |
| In Operation | Owner · 51%JSGX Dafeng H2 | Ownership | Ownership relationship |
| Planned | Owner · 74%Sheyang North District H1# | Ownership | The March 2026 project-company proposal envisaged a 74% interest for Jiangsu Guoxin Group Co., Ltd. |
| In Operation | InvestorLiyang Pumped Storage Power Station | Pumped hydro | Liyang Pumped Storage Power Station |
| In Operation | Indirect ParentShahe Pumped Storage Power Station | Pumped hydro | Shahe Pumped Storage Power Station |