| Planned | Geomorphological assessment consortium leadArklow Bank Wind Park 2 | Consulting | Lease area and export cable route geomorphological assessment for Phase 2 |
| Planned | Floating LiDAR measurement contractorBuchan Offshore Wind | Survey Inspection | EOLOS FLS200 floating LiDAR, two-year deployment with quarterly maintenance |
| In Construction | Metocean and seabed consultancyEast Anglia THREE | Survey Inspection | East Anglia THREE |
| Consented | Floating LiDAR and metocean measurement contractorGreen Volt | Survey Inspection | Two floating LiDARs, wave buoy, subsea ADCP and marine growth plates, deployed for about a year from June 2024 |
| In Operation | Metocean monitoring contractorHywind Scotland Pilot Park | Survey Inspection | Real-time wave and current measurement |
| Planned | Metocean measurement contractorKorsnäs | Survey Inspection | Korsnäs offshore wind project |
| Consented | Metocean measurement contractorNorth Falls | Survey Inspection | Metocean equipment deployed on 17 April 2026 for a 12–18 month survey, with completion planned by 16 August 2027 |
| Planned | Floating LiDAR and metocean measurement contractorOriel Wind Farm | Survey Inspection | EOLOS FLS200 floating LiDAR measuring wind, waves, current and temperature over a year from October 2019 |
| Consented | Metocean survey contractorSeagreen | Survey Inspection | Seagreen offshore wind farm metocean survey |
| Consented | Other | Onshore grid assets | Buchan Offshore Wind · Intermediate Connection Asset |
| In Operation | Other | Onshore grid assets | Buchan Offshore Wind · Final Grid Connection Point |
| Planning | Other | Onshore grid assets | Oriel Wind Farm · Final Grid Connection Point |