| In Operation | Transmission connection providerBouldercombe Battery project | Grid Connection | Bouldercombe Battery project |
| In Operation | Transmission network connectionBrendale BESS | Grid Connection | Battery storage installation |
| In Construction | Transmission connectionBroadsound BESS | Grid Connection | Broadsound project connection |
| In Operation | Transmission connection partnerSupernode Battery (Stage 1) | Grid Connection | Stage 1 connection at South Pine Substation |
| In Operation | Transmission connection partnerSupernode Battery (Stage 2) | Grid Connection | Supernode Stage 2 at South Pine |
| In Operation | Transmission connection providerSwanbank Battery | Grid Connection | Swanbank Battery |
| In Operation | Transmission connection providerUlinda Park Battery | Grid Connection | Scope not set |
| In Operation | Transmission connection providerWandoan South BESS | Grid Connection | Wandoan South BESS |
| In Construction | Transmission connection network operatorWoolooga Battery | Grid Connection | Connection network relationship; the substation remains separate grid infrastructure. |