| Planned | Preliminary design and environmental assessment consultantCalypso | Engineering And Design | Calypso floating offshore wind proposal |
| Planned | Environmental assessment and engineering consultantDorada | Engineering And Design | Dorada floating offshore wind project |
| Planned | Illustrative engineering-report authorKrimisa | Engineering And Design | December 2022 Krimisa maritime-concession submission |
| Planned | Technical study authorMoDiCa | Engineering And Design | MoDiCa |
| Planned | Electrical system designNora Energia 1 | Engineering And Design | Nora Energia 1 |
| Pre-Tender | Technical report consultantSeawind Brindisi | Technical Advisory | January 2023 Seawind Brindisi maritime concession application |
| Planned | Preliminary engineering consultantThalassa | Engineering And Design | Thalassa |
| Planning | Other | Onshore grid assets | Dorada · Final Grid Connection Point |