| Pre-Tender | HexaFloat technology developerAFLOWT France | Floating Technology Demonstration | AFLOWT France |
| Planned | Historical offshore wind co-development memorandumAgnes 2 | Historical Development Context | Earlier two-site AGNES offshore wind development off Ravenna |
| Planned | Original development collaborationAGNES Romagna 1 | Historical Development Context | AGNES Adriatic renewable energy programme, including the Romagna offshore wind sites |
| In Construction | Monopile foundation design, construction and installation contractorCalvados | Foundations | Calvados 64 monopile foundations and transition pieces |
| In Construction | Offshore substation transport and installation contractorDogger Bank A | Transport Installation | Dogger Bank A and B offshore substation platforms and jackets |
| In Construction | Offshore substation transport and installation contractorDogger Bank B | Transport Installation | Dogger Bank B offshore substation platform and jacket |
| In Construction | Gravity foundation EPCI contractorFécamp Offshore | Foundations | 71 gravity-based structures for Fécamp |
| In Construction | Jacket foundation fabricatorFormosa 2 OWF | Foundations | 32 Formosa 2 wind turbine jacket foundations fabricated at Karimun Yard |
| Planned | Floating foundation technology collaborationHannibal | Foundations | 7SeasMed floating offshore wind project |
| Planned | Floating foundation collaboration partnerIchnusa | Engineering And Technical | Ichnusa floating offshore wind project |
| In Construction | Jacket foundation EPCI contractorNeart na Gaoithe | Foundations | 54 WTG jacket foundations and two offshore transformer platform jackets |
| Pre-Tender | Prospective engineering and construction partnerPlambeck Emirates | Engineering And Design | Proposed 500 MW floating offshore wind development in Saudi Arabia |
| In Construction | Offshore substation installation vessel providerSaint-Brieuc | Transport Installation | Installation of offshore substation jacket and topside using Saipem 7000 |