DescriptionTrianel Windkraftwerk Borkum II GmbH & Co. KG operates the second phase of the Trianel Windpark Borkum offshore wind farm in the German North Sea. The phase has 32 Senvion turbines with a combined rated capacity of 202.56 MW and has been fully operational since June 2020.