| In Construction | Offshore cable installation contractorAberdeen (EOWDC) | Cables | 66 kV inter-array and export cable installation package |
| In Construction | Inter-array cabling contract awardeeAlbatros | Cables | Albatros inter-array cable system and interconnection with Hohe See |
| In Construction | 66 kV cable installation contractorBlyth Offshore | Cables | Inter-array cables connecting turbines to the onshore grid |
| In Construction | Cable EPCI contractorButendiek | Cables | Butendiek submarine cable package |
| In Construction | Inter-array cable EPCI contractorDudgeon | Cables | Design, supply, installation and testing of 67 infield cables totalling about 100 km |
| In Construction | Offshore export cable installation contractorDudgeon | Cables | Offshore export cable installation |
| In Construction | Array cable installation contractorGalloper | Cables | 56 inter-array cables |
| In Construction | Export cable installation contractorGalloper | Cables | Two 45 km export cables, including route preparation, landfall, burial, termination and testing |
| In Construction | Inter-array cabling contract awardeeHohe See | Cables | Hohe See inter-array cabling |
| In Construction | 33 kV inter-array cable installation subcontractorHorns Rev 3 | Cables | Cable connections between turbines and transformer platform |
| In Construction | Array and export cable installation contractorHumber Gateway | Cables | Array cable installation completion and export cable installation/connection |
| In Construction | Offshore export cable installation contractorHumber Gateway | Cables | Two offshore subsea export cables |
| In Construction | Export and array cable installation contractorLondon Array | Cables | All export and array cable installation |
| In Construction | Inter-array cable installation contractorMeerwind Süd / Ost | Cables | 88 inter-array cables and 176 pull-ins |
| In Construction | Infield cable installation contractorNordsee Ost | Cables | 52 infield cables connecting turbines to the offshore high-voltage station |
| In Construction | Export cable installation contractorRampion | Cables | Export cable installation |
| In Construction | Inter-array cable supply and installation contractorSandbank | Cables | Sandbank inter-array cables and cable protection system |
| In Construction | Submarine cable installation and trenching contractorSheringham Shoal | Cables | Installation, termination, trenching, cable protection systems and secondary cable connection works |
| In Construction | Subsea export cable installation contractorWalney Phase 1 | Cables | Walney 1 subsea export cable installation |
| In Construction | Inter-array cable installation contractorWalney Extension | Cables | 87 inter-array cables, route engineering, pre-lay grapnel run, cable transport, installation and trenching |
| In Construction | Offshore export cable installation contractorWest of Duddon Sands | Cables | Two 41 km 170 kV offshore cables |
| In Construction | Infield and export cable contractorWestermeerwind | Cables | Infield cables between 48 wind turbines and six export cables to the onshore substation |
| In Construction | Offshore export cable installation contractorWestermost Rough | Cables | 11.8 km offshore export cable |