Christies Beach Wastewater Treatment Plant Battery
Christies Beach Wastewater Treatment Plant Battery battery storage overview.
The Christies Beach battery is co-located with renewable generation at SA Water’s wastewater treatment plant at O’Sullivan Beach. Developed through the utility’s Zero Cost Energy Future programme, it helps manage site electricity demand and energy costs.In OperationAustralia
At a Glance
Capacity
2.2 MWEnergy storage
4.3 MWhStorage duration
2 hoursStorage type
Co Located RenewableOwner
South Australian Water CorporationOperator
Data coming soonCountry
AustraliaLocation
-35.123°, 138.473°Website
Official project pageOwnership
1 record| Share | Organisation | Role | Details | Period |
|---|---|---|---|---|
| Unknown | Owner Operator | Owns and operates the battery at its Christies Beach wastewater treatment plant. | Current / not dated |
Organisations
3 recordsOrganisations recorded as working on this asset or its project, and their role.
| Organisation | Role | Details |
|---|---|---|
| Solar and battery construction contractorEpc Balance Of Plant | Delivered the solar and battery installation as part of SA Water’s Zero Cost Energy Future programme. | |
| Project proponentDevelopment | Developed the installation through its Zero Cost Energy Future programme. | |
| Battery system technology providerEquipment Supply | The March 2022 electricity generation licence schedule identifies a Tesla Powerpack battery system. |
Supplier registration
Developer supplier portalHow suppliers get onto this project's radar: its standing register, supplier portal or contact route.
Prospective suppliers can use the operator’s bidder-registration portal to participate in sourcing activities. Open tenders are advertised through the South Australian Government’s tender platform.
SA Water’s portfolio-wide supplier portal offers initial bidder registration for prospective suppliers; the route is not specific to the Christies Beach battery.
SourceChecked 27 Oct 2026