Clements Gap Battery
Clements Gap Battery battery storage overview.
Clements Gap Battery is a two-hour storage installation beside the existing wind farm in South Australia's Mid North. It uses Trina Storage battery containers and SMA inverters, with a grid connection delivered through ElectraNet. First energisation on 9 December 2025 began staged commissioning.In ConstructionAustralia
At a Glance
Capacity
60 MWEnergy storage
120 MWhStorage duration
2 hoursStorage type
Co Located RenewableOwners
Pacific Hydro Clements Gap BESS Pty Ltd +1 moreOperator
Data coming soonCountry
AustraliaLocation
-33.508°, 138.129°Website
Official project pageOwnership
2 records| Share | Organisation | Role | Details | Period |
|---|---|---|---|---|
| Unknown | Designated Operator | Pacific Hydro Clements Gap BESS holds the electricity generation licence for the Clements Gap battery. | Current / not dated | |
| Unknown | Owner | AEMO's July 2026 generation survey names Pacific Hydro Clements Gap as the owner of the Clements Gap battery site. | Current / not dated |
Organisations
11 recordsOrganisations recorded as working on this asset or its project, and their role.
| Organisation | Role | Details |
|---|---|---|
| Transmission connection providerGrid Connection | ElectraNet delivers the transmission connection serving the battery installation. | |
| Owner's engineer and grid connection adviserEngineering Consulting And Project Management | Grid-Link supports technical oversight, design review, grid connection modelling, control systems and commissioning. | |
| Contracted operations and maintenance providerOperations Maintenance | The generation licence application identifies an operations and maintenance agreement with Enzen Australia, now NXZEN Australia. | |
| Engineering, procurement and construction contractorEpc Balance Of Plant | NXZEN Australia, formerly Enzen Australia, was appointed to deliver the battery project. | |
| Equipment logistics contractorTransport Installation | One Global Logistics handled customs clearance, port logistics, storage and delivery of the battery containers and inverters. | |
| Licensed battery project companyProject Company And Consenting | The company holds the electricity generation licence for the Clements Gap battery. | |
| AEMO-listed site ownerOwnership History | AEMO's July 2026 generation survey identifies the company as the battery site's owner. | |
| Battery developerDevelopment And Asset Management | Pacific Blue developed the Clements Gap battery beside its existing wind farm. | |
| Principal construction and electrical contractorEpc Balance Of Plant | PSD Energy provides design, delivery, construction and commissioning, including electrical infrastructure and the battery substation. | |
| Battery inverter supplierEquipment Supply | SMA supplies the inverters for the battery installation. | |
| Battery equipment manufacturerEquipment Supply | The project uses Trina Storage battery containers. |
Supplier registration
Contact page onlyHow suppliers get onto this project's radar: its standing register, supplier portal or contact route.
Prospective suppliers can express interest by email through the operator's corporate supplier guidance. Subcontractors are directed towards local business networks and industry capability databases.
Pacific Blue's portfolio-wide email supplier-interest route, with subcontractor visibility through local councils, development boards and the Industry Capability Network. Registration of interest does not confer approval.
SourceChecked 27 Oct 2026