Eraring Big Battery
Eraring Big Battery battery storage overview.
The operating Eraring Big Battery is the initial 460 MW battery at Origin’s Eraring energy site in New South Wales. The first battery and its energy-storage extension entered commercial operation in late 2025. It stores electricity from the grid and discharges during periods of demand, while a separate 240 MW battery remains under construction.In OperationAustralia
At a Glance
Capacity
460 MWEnergy storage
1,770 MWhStorage duration
3.9 hoursStorage type
UnknownOwners
Origin Energy +1 moreOperator
Data coming soonCountry
AustraliaLocation
-33.067°, 151.514°Website
Official project pageOwnership
2 records| Share | Organisation | Role | Details | Period |
|---|---|---|---|---|
| Unknown | ![]() | Indirect Parent | Origin Energy’s owned-storage portfolio includes the operating initial Eraring battery and its energy-storage extension. | Current / not dated |
| Unknown | Developer | Origin Energy Eraring Pty Limited is the project proponent responsible for delivering the Eraring BESS development. | Current / not dated |
Organisations
7 recordsOrganisations recorded as working on this asset or its project, and their role.
| Organisation | Role | Details |
|---|---|---|
| Battery design and construction contractorEpc Balance Of Plant | Enerven was appointed to construct the original 460 MW Eraring battery, working alongside Origin and Wärtsilä. | |
| Accredited and principal certifierCertification And Technical Assurance | Provided building and structural compliance certification for the initial Eraring battery. Its project reference distinguishes operational testing from later commercial operation. | |
| Battery development and investment groupDevelopment And Finance | Developed and invested in the initial Eraring battery and its energy-storage extension, which entered commercial operation in late 2025. | |
| Eraring BESS proponentProject Company And Development | The independent environmental audit identifies Origin Energy Eraring Pty Limited as the applicant responsible for delivery of the Eraring BESS project. | |
| Civil-works contractorEpc Balance Of Plant | Engaged by Enerven for bulk earthworks, stormwater and drainage, pavement and kerbing works, with its scope expanded to include substation foundation works. | |
| Transmission connection infrastructure operatorGrid Connection | The Eraring BESS connects through the existing Transgrid switchyard at Eraring via new high-voltage connection infrastructure. | |
| Battery energy-storage system supplierEquipment Supply | Origin selected Wärtsilä for the initial battery in 2023 and its subsequent storage extension in 2024. Later Eraring stages have their own delivery scope and schedules. |