Lake Bonney Battery Energy Storage
Lake Bonney Battery Energy Storage battery storage overview.
Lake Bonney is a battery storage installation beside the Lake Bonney wind farms near Millicent in South Australia. It uses Tesla Powerpack technology to provide dispatchable electricity and frequency control services. The battery was energised in 2019 and supports Iberdrola Australia’s renewable energy portfolio.In OperationAustralia
At a Glance
Capacity
25 MWEnergy storage
52 MWhStorage duration
2.1 hoursStorage type
Co Located RenewableOwners
Iberdrola Australia +1 moreOperator
Data coming soonCountry
AustraliaLocation
-37.739°, 140.387°Website
Official project pageOwnership
2 records| Share | Organisation | Role | Details | Period |
|---|---|---|---|---|
| Unknown | ![]() | Indirect Parent | Iberdrola Australia Limited is the parent company of the battery’s project company. | Current / not dated |
| Unknown | Owner | Lake Bonney BESS Pty Limited owns the battery installation and is a wholly owned subsidiary of Iberdrola Australia Limited. | Current / not dated |
Organisations
13 recordsOrganisations recorded as working on this asset or its project, and their role.
| Organisation | Role | Details |
|---|---|---|
| Market integration and performance assessment authorityRegulatory Permitting | AEMO participated in the generator performance standards and system strength assessment processes for the battery connection. | |
| Public grant funding partnerPublic Funding And Award | ARENA committed up to A$5 million towards development of the battery. | |
| Original balance of plant installation contractorEpc Balance Of Plant | Consolidated Power Projects supported battery installation and balance of plant works, including initial substation earthworks. | |
| Transmission connection and substation works providerGrid Connection | ElectraNet delivered the substation extension and provided the battery’s transmission connection. | |
| Original grid modelling consultantTechnical Advisory | Entura carried out grid connection modelling and technical studies for the battery development. | |
| Electricity generation licensing authorityRegulatory Permitting | The Essential Services Commission approved the generation licence variation authorising the 25 MW battery export capacity. | |
| State grant funding partnerPublic Funding And Award | The South Australian Government committed up to A$5 million towards development of the battery. | |
| Developer and operating groupDevelopment And Operation | Infigen Energy, now Iberdrola Australia, developed the battery and operates it within its renewable energy and retail portfolio. | |
| Battery asset companyOwner Operator | Lake Bonney BESS Pty Limited is the company owning the battery storage installation. | |
| Electricity generation licenseeProject Company And Consenting | Lake Bonney Wind Power’s electricity generation licence was varied to include the battery on 1 October 2019. | |
| Original battery EPC and technology providerEpc Balance Of Plant | Tesla delivered the original Powerpack battery under an engineering, procurement and construction contract. | |
| Original OEM maintenance and dispatch software providerOperations Maintenance | The 2020 project report documents Tesla equipment maintenance and AutoBidder software service agreements. | |
| Historical high-voltage switching contractorOperations Maintenance | The 2020 project report identifies Vestas as the high-voltage switching contractor, drawing on its existing site presence. |
Supplier registration
Developer supplier portalHow suppliers get onto this project's radar: its standing register, supplier portal or contact route.
Suppliers can access the group’s procurement guidance and invitation-based supplier platform. Engagement takes place through group-wide purchasing processes.
Iberdrola’s group-wide supplier platform requires an invitation for tender participation; it is not a Lake Bonney-specific supplier register.
SourceChecked 28 Oct 2026