New England Battery
New England Battery battery storage overview.
New England Battery is co-located with the New England Solar development near Uralla, New South Wales. Its Energy Vault storage system and Siemens grid-forming inverters are designed to support power-system stability and shift electricity to periods of higher demand.In ConstructionAustralia
At a Glance
Capacity
200 MWEnergy storage
400 MWhStorage duration
2 hoursStorage type
Co Located RenewableOwner
ACEN Australia Pty LtdOperator
Data coming soonCountry
AustraliaLocation
-30.621°, 151.606°Website
Official project pageOwnership
1 record| Share | Organisation | Role | Details | Period |
|---|---|---|---|---|
| Unknown | ![]() | Owner | ACEN Australia identifies itself as the battery project’s developer and owner. | Current / not dated |
Organisations
10 recordsOrganisations recorded as working on this asset or its project, and their role.
| Organisation | Role | Details |
|---|---|---|
| Battery project developerDevelopment | ACEN Australia developed and managed construction of the battery project. | |
| Designated operating entityDevelopment And Operation | The plan names ACEN NESF HoldCo as designated operator for the combined development. | |
| Battery-system EPC contractorEpc Balance Of Plant | Energy Vault supplied and installed the B-VAULT system. | |
| High-voltage works EPC contractorSubstation Electrical | EPEC Projects delivered the battery substation works under a separate EPC contract. | |
| Grid-connection infrastructure partnerGrid Connection | The delivery report identifies Transgrid/Lumea for the connection works. | |
| Development cooperation partnerDevelopment And Finance | ACEN Australia and Marubeni Asian Power Singapore announced a cooperation agreement for joint development. The announcement described a proposed partnership. | |
| Emerging Energy Program supportPublic Funding And Award | NSW Government capital funding supports the project’s initial section and knowledge-sharing programme. | |
| Battery-module manufacturerEquipment Supply | REPT manufactured the battery modules used in the storage system. | |
| Grid-forming inverter technologyEquipment Supply | The battery uses Siemens SINAMICS S120 inverters. | |
| Transmission-network connectionGrid Connection | Transgrid provides the transmission connection for the battery. |
Supplier registration
Developer supplier portalHow suppliers get onto this project's radar: its standing register, supplier portal or contact route.
Suppliers can register their capabilities through the operator’s ICN Gateway portfolio page. Dedicated contractor pages carry project opportunities when released.
ACEN Australia’s ICN Gateway page covers its portfolio, including New England regional opportunities. It is not a dedicated register for this 200 MW battery.
SourceChecked 27 Oct 2026