Torrens Island BESS
Torrens Island BESS battery storage overview.
Torrens Island BESS is a grid-scale battery at AGL’s Torrens Island energy site near Adelaide. Opened in August 2023, it stores electricity for later use and provides rapid-response services to the South Australian grid. Wärtsilä delivered the energy-storage system, using SMA battery inverters.In OperationAustralia
At a Glance
Declared capacity
250 MWEnergy storage
250 MWhStorage duration
1 hourStorage type
Co Located Fossil FuelOwners
AGL Energy +1 moreOperator
Data coming soonCountry
AustraliaLocation
-34.803°, 138.521°Website
Official project pageOwnership
2 records| Share | Organisation | Role | Details | Period |
|---|---|---|---|---|
| Unknown | ![]() | Owner | AGL is identified as the owner of the Torrens Island battery by its inverter supplier. | Current / not dated |
| Unknown | Operator | AGL SA Generation Pty Limited holds the generation licence authorising operation of the Torrens Island battery. | Current / not dated |
Organisations
6 recordsOrganisations recorded as working on this asset or its project, and their role.
| Organisation | Role | Details |
|---|---|---|
| Battery owner and developerOwner Operator | Developed the Torrens Island battery as part of the redevelopment of its existing energy site. | |
| Licensed generation operatorConcession And Project Tracking | Its generation licence was varied on 15 February 2023 to authorise the 250 MW Torrens Island battery. | |
| Original generation-licence applicantHistorical Development Context | Submitted the original licence application in 2022 before the applicant changed to AGL SA Generation. | |
| Owner’s engineerTechnical Advisory | Provided owner’s-engineer services, including technical and design reviews, factory-acceptance support and grid-connection engineering. | |
| Battery-inverter manufacturerEquipment Supply | Supplied 109 Sunny Central Storage 3600 UP-XT battery inverters integrated in Medium Voltage Power Station 4200-S2 skids. | |
| Energy-storage system EPC contractorEpc Balance Of Plant | Delivered the 250 MW / 250 MWh battery under an engineering, procurement and construction contract, including the GEMS energy-management system. |
Supplier registration
Contact page onlyHow suppliers get onto this project's radar: its standing register, supplier portal or contact route.
Suppliers and contractors can consult the portfolio-wide requirements and make enquiries through the general contact route. Contractor health and safety prequalification applies when services are commissioned.
AGL portfolio-wide supplier guidance and general contact; the published requirements do not establish project-specific registration for Torrens Island.
SourceChecked 28 Oct 2026
Capacity history
Recorded project capacity figures. Future-dated changes are shown but are not used as current capacity.
| Effective | Capacity type | Capacity | Source |
|---|---|---|---|
| Current | Declared capacity | 250 MW | AGL — Torrens Island battery declared power |