Sir Adam Beck Pump
Sir Adam Beck Pump pumped hydro overview.
Sir Adam Beck Pump Generating Station is a pumped-storage facility in Ontario’s Niagara hydroelectric system. Its six generating units use a reservoir to store water during periods of lower demand and return it to generate electricity when required. The station is owned and operated by Ontario Power Generation.In OperationCanada
At a Glance
Capacity
174 MWEnergy storage
1,044 MWhOperator
Data coming soonCountry
CanadaLocation
43.145°, -79.060°Website
Official project pageOwnership
2 records| Share | Organisation | Role | Details | Period |
|---|---|---|---|---|
| Unknown | Owner Operator | Ontario Power Generation owns and operates Sir Adam Beck Pump Generating Station. | Current / not dated | |
| Unknown | Indirect Parent | The Province of Ontario is the sole shareholder of Ontario Power Generation, the station’s owner and operator. | Current / not dated |
Organisations
6 recordsOrganisations recorded as working on this asset or its project, and their role.
| Organisation | Role | Details |
|---|---|---|
| Historical runner refurbishment engineerOperations Maintenance | Worked with OPG on studies and refurbishment of the station’s Deriaz runners and adjustable-flap control system, as documented in the November 2015 technical account. | |
| Hatch-cover replacement contractorOperations Maintenance | Construction certificates identify Champlain-LDV as contractor for the hatch-cover replacement works, including Phase 2 substantially performed on 15 December 2025. | |
Ontario Power Generation Inc | Operator | Not set |
| Pumped-storage owner and operatorOwner Operator | Owns and operates Sir Adam Beck Pump Generating Station in the Niagara hydroelectric system. | |
| Reservoir refurbishment contractorEpc Balance Of Plant | Carried out work on the pumped-storage reservoir refurbishment completed in February 2017. | |
| Original Deriaz runner designerTurbine Design Context | The 2015 technical account by OPG and Alstom engineers identifies English Electric as designer and tester of the station’s original Deriaz runners. |
Supplier registration
Developer supplier portalHow suppliers get onto this project's radar: its standing register, supplier portal or contact route.
Prospective suppliers can request evaluation through the operator’s company-wide supplier registration process. Registration places company information in a sourcing database and does not guarantee a contract.
Ontario Power Generation’s portfolio-wide supplier process, including Sir Adam Beck Pump Generating Station.
Supply chain pageOperator portalwe could not open this
SourceChecked 28 Oct 2026