Gabrovo-RDNO community solar installation
Gabrovo-RDNO community solar installation solar overview.
The roof-mounted solar installation at Gabrovo’s regional non-hazardous waste landfill supplies electricity to municipal waste operations. It was developed through a community partnership of the municipality, residents and businesses; energy sharing with other municipal sites began in September 2024.In OperationBulgaria
At a Glance
Installed capacity
0.0996 MWMounting
RoofOperator
Data coming soonCountry
BulgariaLocation
42.921°, 25.315°Website
Official project pageOwnership
2 records| Share | Organisation | Role | Details | Period |
|---|---|---|---|---|
| Unknown | ![]() | Operator | Energy Community Gabrovo – RDNO operates the community solar installation and accounts for its equipment and electricity activity. | Current / not dated |
| Unknown | ![]() | Developer | The Municipality of Gabrovo initiated the community solar scheme and provided the municipal site, project preparation and administrative support. | Current / not dated |
Organisations
4 recordsOrganisations recorded as working on this asset or its project, and their role.
| Organisation | Role | Details |
|---|---|---|
| Community solar operatorDevelopment And Operation | Coordinates the community photovoltaic installation and the sharing of electricity among participating sites. | |
| Community-energy development adviserConsulting | Supported the municipality’s community-energy model through TANDEMS and assisted the RDNO community’s application to the European Energy Communities Facility. | |
| Community digital-services providerOther | Methodia identifies the Gabrovo energy community as a customer of its software services. | |
| Municipal project initiator and site providerDevelopment And Consenting | Provided the landfill roof and municipal support for development of the community solar initiative. |
Equipment
2 recordsPanels and inverters recorded at this installation, with each unit's rating as its source gives it.
| Equipment | Manufacturer | Model | Units | Unit rating | Source |
|---|---|---|---|---|---|
| InvertersProposed | ASW LT-G2The municipal business-model document specifies two Solplanet ASW LT-G2 inverters rated at 50 kVA each for the proposed installation. | 2 | Not set | Source | |
| PanelsProposed | DHM-72x10The municipal business-model document specifies 181 DAH Solar DHM-72x10 panels rated at 550 Wp each for the proposed installation. | 181 | 550 WDC peak | Source |
Supplier registration
Developer supplier portalHow suppliers get onto this project's radar: its standing register, supplier portal or contact route.
Municipal procurement information is published through the council’s buyer profile on Bulgaria’s electronic procurement platform. The route covers the municipality’s wider purchasing activity.
Municipality of Gabrovo portfolio-wide buyer profile; it covers municipal procurement rather than a dedicated register for the RDNO solar installation.
SourceChecked 28 Oct 2026
Capacity history
Recorded project capacity figures. Future-dated changes are shown but are not used as current capacity.
| Effective | Capacity type | Capacity | Source |
|---|---|---|---|
| 13 Jan 2026 | Declared capacity | 0.1 MW | Gabrovo Municipality (100 kWp) |
| Current | Installed capacity | 0.1 MW | SunSharing best-practice study — Gabrovo–RDNO photovoltaic capacity |

