| In Construction | Offshore balance of plant and construction contractorAberdeen (EOWDC) | Epc Balance Of Plant | Foundations, scour protection, 66 kV array/export cables and wind turbine generator installation |
| In Construction | Suction bucket jacket foundation and scour-protection contractorAberdeen (EOWDC) | Foundations | Eleven suction bucket jacket foundations and scour protection |
| In Construction | Wind turbine generator installation contractorAberdeen (EOWDC) | Transport Installation | Installation of eleven wind turbine generators |
| In Construction | Inter-array cable supply and installation contractorAlbatros | Cables | 19 Albatros 33 kV inter-array cables and Hohe See-Albatros connector works |
| In Construction | Array cable transport and installation contractorArkona | Cables | Arkona array cable system |
| In Construction | Export and array cable transport, installation and seabed preparation contractorBaltica 2 | Cable Supply And Installation Context | Baltica 2 107 array cables and four 275 kV export cables |
| In Construction | Export cable supply and installation consortium partnerBlauwwind | Cables | Borssele Alpha and Beta export cables and interconnector cable |
| In Construction | Inter-array cable transport, installation and burial contractorBorkum Riffgrund III | Cable Supply And Installation Context | Gode Wind 3 and Borkum Riffgrund 3 106 inter-array cable installation package |
| In Construction | Export cable supply and installation consortium partnerBorssele I and II | Cables | Borssele Alpha and Beta export cables and interconnector cable |
| Planned | Seabed investigation providerBorssele I and II | Survey Inspection | Borssele I and II site investigations |
| In Construction | Foundation installation consortium and seabed protection contractorFécamp Offshore | Foundations | Gravity-based foundation installation, scour protection and ballasting works |
| Consented | Inter-array cable supply and installation consortium partnerGennaker | Cables | Approximately 140 kilometres of inter-array cables for Gennaker |
| In Construction | Inter-array cable transport, installation and burial contractorGode Wind 3 | Cables | 106 inter-array cables for Gode Wind III and Borkum Riffgrund 3 |
| In Construction | Offshore substation transport contractorGreater Changhua 2b & 4 | Ports And Logistics | 66 suction bucket jacket foundations and one offshore substation |
| In Construction | Inter-array cable installation contractorHohe See | Cables | Hohe See and Albatros inner-array grid cable installation |
| In Construction | Inter-array cable system contractorHorns Rev 3 | Cables | 33 kV inter-array cables and backup cable |
| Consented | Phase 1 inter-array cable installation contractorIJmuiden Ver Beta | Cables | Zeevonk Phase 1 |
| In Construction | Floating turbine transport and installation contractorKincardine Offshore Windfarm | Transport Installation | Mooring system pre-lay and floating turbine tow-out/installation |
| In Construction | Inter-array cable installation consortium partnerMeerwind Süd / Ost | Cables | Meerwind Süd / Ost inter-array cable installation |
| In Construction | Inter-array cable design, supply, installation and burial contractorMoray East | Cables | 102 66 kV inter-array cables, termination and testing |
| Consented | Geophysical and UXO survey contractorMoray West | Survey Inspection | Offshore site survey and unexploded ordnance identification |
| In Construction | Multidisciplinary offshore construction contractorMoray West | Epc Balance Of Plant | Monopile transport, seabed preparation, scour protection and offshore support scope |
| In Construction | Foundation and offshore substation transport and installation contractorRevolution Wind | Foundation And Marine Works | Revolution Wind foundations and offshore substations |
| In Construction | Export and inter-array cable supply and installation contractorTriton Knoll Wind Farm | Cables | Export and inter-array cable installation package |
| In Construction | Foundation EPCI contractorVeja Mate | Epc Balance Of Plant | 67 monopile foundations and transition pieces |
| In Construction | UXO identification survey and removal contractorVeja Mate | Survey Inspection | Veja Mate seabed UXO identification and clearance |
| In Construction | Foundation transport and installation contractorWest of Duddon Sands | Foundations | Transport and installation of 108 turbine foundations |
| In Construction | Turbine foundation transport and installation contractorWikinger Offshore | Transport Installation | Wikinger jacket foundation installation |
| In Construction | Foundation transport and installation contractorXidao | Foundations | 62 jacket foundations and 186 pin piles installed using Bokalift vessels |
| In Operation | Other | Onshore grid assets | Gode Wind III · Onshore Conversion |
| In Operation | Other | Onshore grid assets | Gode Wind III · Final Grid Connection Point |