| In Construction | Regional sponsor and development groupChangle Area A | Development | Changle Area A offshore wind project |
| In Operation | Full-capacity grid connection milestoneCTG Dafeng H17 | Reference Data | Three Gorges Dafeng H8-1 and H17 |
| In Construction | Owner (80%)CTG Dafeng H17 | Development | CTG Dafeng H17 offshore wind farm within the Three Gorges Jiangsu Dafeng 800 MW project |
| In Construction | Owner-side 220 kV substation and export system referenceCTG Dafeng H17 | Grid And Transmission | H17 220 kV offshore substation, one 220 kV export cable and H8-2 onshore control-centre connection |
| In Construction | Turbine installation milestone reporterCTGNE Jiangsu Dafeng H8-2 | Turbine Supply | Completion of all turbine installation at Jiangsu Dafeng H8-2 |
| In Operation | Majority interest acquirerMeerwind Süd / Ost | Finance Insurance Legal | Acquisition of Blackstone's majority interest in WindMW |
| In Operation | H10 400 MW array and flexible DC export system referenceRudong H10 | Substation Electrical | Rudong H10 offshore wind farm electrical export system |
| In Operation | H6/H10 owner-project commissioning referenceRudong H10 | Reference Data | Rudong H6 and H10 offshore wind projects |
| In Construction | H6/H10 220 kV offshore booster stations and flexible DC export-system ownerRudong H6 | Substation Electrical | Rudong H6 and H10 offshore booster and converter-station export system |
| In Operation | Operating company referenceThree Gorges New Energy Jiangsu Dafeng | Operations Maintenance | Jiangsu Dafeng H11 (Three Gorges) operating offshore wind farm |
| In Construction | DeveloperThree Gorges Yangjiang Qingzhou V | Reference Data | Qingzhou V construction schedule and 2026 continuing construction status |
| In Operation | Project developer and construction sponsorZhangpu Liuao | Development | Zhangpu Liuao Phase 2 offshore wind farm |
| In Operation | Owner · 65%Changle Area A | Ownership | Ownership relationship |
| In Operation | Owner · 80%CTG Dafeng H17 | Ownership | Ownership relationship |
| In Operation | Owner · 20%JSGX Dafeng H1 | Ownership | Ownership relationship |
| In Operation | Owner · 20%JSGX Dafeng H10 | Ownership | Ownership relationship |
| In Operation | Owner · 20%JSGX Dafeng H16 | Ownership | Ownership relationship |
| In Operation | Owner · 20%JSGX Dafeng H2 | Ownership | Ownership relationship |
| In Operation | Non Operating Owner · 56%Meerwind Süd / Ost | Ownership | China Three Gorges Corporation indirectly owns 56% of WindMW GmbH, the owner/operator of Meerwind Süd / Ost, through its 70% control of the vehicle that acquired Blackstone’s 80% WindMW stake. |