| In Construction | Jacket lifting and load-out contractorAberdeen (EOWDC) | Transport Installation | Fabrication-yard lifting and load-in/load-out of Aberdeen/EOWDC jackets at Wallsend |
| In Construction | Monopile loading contractorArcadis Ost 1 | Transport Installation | Loading of monopiles weighing up to approximately 2,090 tonnes at Nordenham |
| In Construction | Monopile load-out contractorBaltic Eagle | Transport Installation | Load-out of 52 monopiles at Rostock |
| In Construction | Offshore substation load-out contractorBaltic Eagle | Transport Installation | Load-out of the 4,560-tonne Baltic Eagle offshore substation at Hoboken |
| In Construction | Transition-piece handling and load-out contractorBaltic Power | Transport Installation | Load-in, internal transport, upending and load-out of transition pieces at Newcastle |
| In Construction | Jacket transport and heavy-lift contractorBeatrice | Transport Installation | Transport and lifting of 28 jacket substructures at Methil |
| In Construction | Offshore substation topside transport contractorBurbo Bank Extension | Transport Installation | Transport of the 2,400-tonne BBW 02-Z01 topside at Hoboken |
| In Construction | Heavy lift and load-in/load-out contractorCa Mau | Marine Vessels Logistics | Ca Mau 1 wind turbine modules at Long An International Port |
| In Construction | Offshore substation load-out contractorCalvados | Transport Installation | Load-out of the 2,100-tonne U34 offshore substation at Saint-Nazaire |
| In Construction | Floating-wind prototype assembly and load-out contractorCulzean Floating Wind Pilot Project | Transport Installation | Floating foundation assembly and load-out at Wergeland Base, Norway |
| In Construction | Foundation and offshore substation component logistics contractorCVOW Commercial | Marine Vessels Logistics | 176 monopiles, 176 transition pieces, and three offshore-substation jackets and topsides at Portsmouth Marine Terminal |
| In Construction | Offshore substation and foundation load-out contractorDanTysk | Transport Installation | Load-out of topside, jacket, piles and boat-landing components |
| In Construction | Jacket foundation transport contractorEast Anglia ONE | Marine Vessels Logistics | Transport of 102 three-legged jacket foundations at Wallsend |
| In Construction | Foundation component marshalling contractorEnBW He Dreiht | Marine Vessels Logistics | Monopiles and transition pieces at BUSS Terminal Eemshaven |
| In Construction | Transition-piece handling and upending contractorEnBW He Dreiht | Transport Installation | Load-in, internal transport, upending and load-out of transition pieces at Newcastle |
| In Construction | Gravity-base foundation lifting, transport and load-out contractorFécamp Offshore | Transport Installation | 71 gravity-based turbine foundations at Le Havre |
| In Construction | Jacket and pile load-out contractorGemini | Transport Installation | Load-out of two jackets and eight piles at Vlissingen |
| In Construction | Offshore high-voltage station transport contractorGemini | Marine Vessels Logistics | Transport of two offshore high-voltage stations from Hoboken |
| In Construction | Tripod foundation transport and load-out contractorGlobal Tech I | Transport Installation | Transport and load-out of five tripod foundations at Vlissingen |
| In Construction | Offshore substation foundation load-out contractorGode Wind I | Transport Installation | Load-out of a topside, jacket and piles for Gode Wind I |
| In Construction | Offshore substation foundation load-out contractorGode Wind II | Transport Installation | Load-out of a topside, jacket and piles for Gode Wind II |
| In Construction | Jacket assembly and integration contractorGreater Changhua 2b & 4 | Transport Installation | Assembly and integration of 33 steel wind-turbine jackets at Vung Tau |
| In Construction | Floating-foundation load-out and WTG assembly contractorGruissan | Transport Installation | Three floating foundations and associated WTG components at Port-la-Nouvelle |
| In Construction | Foundation component port-logistics contractorGwynt y Môr | Marine Vessels Logistics | Load-in, load-out and onshore transport of transition pieces and piles at Birkenhead |
| In Construction | Jacket and pin-pile marshalling contractorHai Long 2B / 3 | Marine Vessels Logistics | Marshalling of 52 tripod jackets and 156 pin piles at Anping |
| In Construction | Offshore substation topside weighing and load-out contractorHohe See | Transport Installation | Weighing and load-out of the 4,358-tonne Hohe See topside |
| In Construction | Nearshore prototype turbine installation contractorHooksiel | Transport Installation | Installation of the Bard 5 MW nearshore prototype turbine at Hooksiel |
| In Construction | Offshore substation jacket transport and load-out contractorHornsea Project One | Transport Installation | Weighing, quay transport and load-out of four offshore substation jackets |
| In Construction | Offshore converter-station transport and load-out contractorHornsea Project Three | Transport Installation | Offshore converter stations Z01 and Z02, each weighing approximately 7,657 tonnes |
| In Operation | Floating-turbine maintenance heavy-lift and transport contractorHywind Scotland Pilot Park | Operations Maintenance | Five Hywind Scotland floating turbines at Wergeland Base |
| In Construction | Offshore transformer module and jacket assembly logistics contractorInch Cape | Transport Installation | Jacket, offshore transformer module and two AC transformers at Wallsend |
| In Construction | Foundation component load-out contractorLondon Array | Transport Installation | Load-out of 175 transition pieces and 175 monopiles |
| In Construction | Monopile transport and lifting contractorLuchterduinen | Transport Installation | Transport and lifting of monopiles at Vlissingen |
| In Construction | Offshore substation jacket load-out contractorMerkur Offshore | Transport Installation | Load-out of the 1,700-tonne Merkur offshore substation jacket |
| In Construction | Jacket weighing, lifting and load-out contractorMoray East | Transport Installation | Weighing, lifting and load-out of 48 jackets at Hamriyah and Sharjah |
| In Construction | XXL monopile marshalling contractorMoray West | Marine Vessels Logistics | 62 XXL monopiles at Invergordon Port |
| In Construction | Jacket port-logistics contractorNeart na Gaoithe | Marine Vessels Logistics | Load-in, storage transport and load-out of wind-turbine jackets at Wergeland Base |
| In Construction | Foundation component marshalling contractorNoirmoutier | Marine Vessels Logistics | Load-in, marshalling and load-out of 61 monopiles and 61 transition pieces at La Rochelle |
| In Construction | Wind-turbine component logistics contractorNoirmoutier | Marine Vessels Logistics | Transport of blades, towers and nacelles for 61 turbines at Saint-Nazaire |
| In Construction | Jacket transport contractorNordsee Ost | Marine Vessels Logistics | Transport of 28 jackets at Bremerhaven |
| In Construction | Wind-turbine installation contractorPrinses Amalia | Transport Installation | Installation support for 60 offshore wind turbines |
| In Construction | Floating-foundation assembly and load-out contractorProvence Grand Large | Transport Installation | Assembly, weighing and load-out of three floating foundations at Fos-sur-Mer |
| In Construction | Offshore substation weighing and load-out contractorRace Bank | Transport Installation | Weighing and load-out of the ROW01-Z01 and ROW01-Z02 offshore substations |
| In Construction | Offshore substation topside weighing and load-out contractorRiffgat | Transport Installation | Weighing and load-out of the 2,030-tonne Riffgat topside |
| In Construction | Jacket assembly heavy-lift contractorSaint-Brieuc | Transport Installation | Installation of the upper sections of 62 jackets at El Ferrol |
| In Construction | Jacket marine-transport contractorSaint-Brieuc | Marine Vessels Logistics | Transport of jackets from El Ferrol to Brest |
| In Construction | Offshore substation load-out contractorSaint-Brieuc | Transport Installation | Load-out of the 4,212-tonne offshore substation at Hoboken |
| In Construction | Pin-pile lifting contractorSaint-Brieuc | Transport Installation | Lifting of 186 pin piles at Cherbourg |
| In Construction | Turbine tower assembly and component load-out contractorSaint-Brieuc | Transport Installation | Tower sections and blade load-out support for 62 turbines at Le Havre |
| In Construction | Foundation component storage and handling contractorSaint-Nazaire | Marine Vessels Logistics | Storage and handling of monopiles and transition pieces at La Rochelle |
| In Construction | Jacket upending engineering and load-out contractorSeagreen | Transport Installation | Upending-system design and load-out support for offshore-wind jackets at Penglai |
| In Construction | Offshore substation transport contractorSeamade (Mermaid) | Transport Installation | Transport of the 1,200-tonne Mermaid offshore substation |
| In Construction | Offshore converter-platform weighing and load-out contractorSofia | Transport Installation | Sofia offshore converter-platform jacket and 14,000-tonne topside |
| In Construction | Floating wind demonstrator participantThe Wheel | Other | WHEEL floating offshore wind demonstrator |
| In Construction | Turbine and gravity-base foundation installation contractorThorntonbank Phase 1 | Transport Installation | Installation of six turbines and inland transport of six concrete gravity-base foundations |
| In Construction | Wind-turbine load-out contractorThorntonbank Phase 2 | Transport Installation | Load-out of 30 six-megawatt turbines at Ostend |
| In Construction | Wind-turbine installation contractorThorntonbank Phase 3 | Transport Installation | Installation support for 18 six-megawatt turbines |
| In Construction | Jacket lifting and load-out contractorTriton Knoll Wind Farm | Transport Installation | Fabrication-yard lifting and load-in/load-out of Triton Knoll jackets at Wallsend |
| In Construction | Offshore substation platform load-out contractorTriton Knoll Wind Farm | Transport Installation | Load-out of the Triton Knoll East offshore substation platform |
| In Construction | Offshore substation transport contractorVeja Mate | Transport Installation | Transport of the 2,477-tonne Veja Mate offshore substation topside |
| In Construction | Monopile load-in contractorVineyard Wind 1 | Marine Vessels Logistics | Load-in and storage-area transport of 15 monopiles at Sydney, Nova Scotia |
| In Construction | Foundation pile installation contractorWindpark Fryslân | Transport Installation | Installation of 89 foundation piles in the IJsselmeer |
| In Construction | Offshore transformer module transport and load-out contractorZheneng Jiaxing 1 | Transport Installation | Transport and load-out of a transformer-module jacket and topside at Ningbo |