| In Construction | Suction bucket jacket manufacturing and assembly contractorAberdeen (EOWDC) | Foundations | Lower jacket structures and final assembly of eleven suction bucket foundations |
| In Construction | Transformer substation consortium partnerAmrumbank West | Substation Electrical | Amrumbank West offshore transformer substation |
| In Construction | Offshore substation structural fabrication contractorBaltic Eagle | Substation Electrical | Structural elements of the Baltic Eagle offshore substation |
| In Construction | Transition piece supplierBaltic Power | Foundations | Baltic Power transition pieces |
| In Construction | Internal foundation platform supplierBaltica 2 | Foundations | 107 suspended internal platforms for Baltica 2 foundations |
| Consented | Offshore substation EPCI contractorBałtyk 2 | Substation Electrical | Two offshore substation platforms for Baltyk 2 and Baltyk 3 |
| Consented | Transition piece manufacturerBałtyk 2 | Foundations | 50 transition pieces for Baltyk 2, within 100 transition pieces across Baltyk 2 and Baltyk 3 |
| Consented | Offshore substation EPCI contractorBałtyk 3 | Substation Electrical | Two offshore substation platforms for Baltyk 2 and Baltyk 3 |
| Consented | Transition piece manufacturerBałtyk 3 | Foundations | 50 transition pieces for Baltyk 3, within 100 transition pieces across Baltyk 2 and Baltyk 3 |
| In Construction | Monopile and transition piece supplierBarrow | Foundations | Monopiles and offshore substation support structure |
| In Construction | Jacket foundation fabricatorBeatrice | Foundations | Beatrice jacket foundation fabrication |
| In Construction | Offshore high-voltage station contractorBelwind | Substation Electrical | Belwind OHVS |
| In Construction | Offshore high-voltage station contractorBelwind Haliade Demonstration | Substation Electrical | Belwind OHVS |
| In Construction | Foundation supplierBurbo Bank | Foundations | Wind turbine generator foundations |
| In Construction | Offshore substation EPCI consortium memberButendiek | Substation Electrical | Butendiek offshore substation |
| In Construction | Offshore substation EPC joint-venture contractorCrossWind | Substation Electrical | Hollandse Kust Noord offshore substation topside and jacket |
| In Construction | Transition-piece fabricator and assemblerDogger Bank A | Foundations | Dogger Bank transition pieces |
| In Construction | Transition-piece fabricator and assemblerDogger Bank B | Foundations | Dogger Bank B transition pieces |
| In Construction | Transition-piece fabricator and assemblerDogger Bank C | Foundations | Dogger Bank C transition pieces |
| In Construction | Transition piece fabrication contractorDudgeon | Foundations | 67 transition pieces for the 402 MW development |
| Consented | Transition piece manufacturing partnerEast Anglia TWO | Foundation Supply | 64 transition pieces for East Anglia TWO |
| In Operation | Offshore grid platform contractor partnerEcowende | Substation Electrical | TenneT Hollandse Kust (west) Alpha offshore substation |
| Consented | Transition piece manufacturing partnerEnBW He Dreiht | Foundation Supply | 64 transition pieces for He Dreiht |
| In Construction | Transition piece fabricatorGalloper | Foundations | Transition pieces for 56 turbine foundations |
| In Construction | High-voltage station contractorGemini | Substation Electrical | Two offshore substations and one onshore station |
| In Construction | Transition-piece fabricatorGemini | Foundations | Secondary steel, surface treatment and delivery for 150 transition pieces |
| In Construction | Offshore substation delivery consortium partnerGennaker | Substation Electrical | OSS Zingst and OSS Darß, OST-6-1 grid connection |
| In Construction | Secondary steel fabricatorGode Wind 3 | Foundations | 107 transition pieces/secondary steel components for Gode Wind III and Borkum Riffgrund 3 |
| In Construction | Floating foundation fabrication and launch partnerGolfe du Lion | Foundations | Fos-sur-Mer launch campaign for EFGL WindFloat platforms |
| In Construction | Foundation supplierGunfleet Sands 1 | Foundations | Gunfleet Sands wind turbine foundations |
| In Construction | Foundation supplierGunfleet Sands 2 | Foundations | Gunfleet Sands wind turbine foundations |
| In Construction | Foundation fabrication partnerHohe See | Foundations | Hohe See monopile foundation production |
| In Construction | Offshore substation consortium contractorHohe See | Substation Electrical | Hohe See offshore substation |
| In Construction | Secondary steel manufacturer and assembly contractorHornsea Project Three | Foundations | Hornsea Project Three |
| In Operation | Offshore transformer module and jacket fabricatorInch Cape | Substation Electrical | Inch Cape offshore substation and 68 metre jacket foundation |
| In Construction | Offshore substation steel construction providerMerkur Offshore | Substation Electrical | Offshore substation topside and jacket steel structures |
| In Construction | Offshore substation consortium partnerMoray West | Substation Electrical | Two offshore substation platforms |
| In Construction | Offshore substation topside assembly and fit-out yardMoray West | Substation Electrical | Two Offshore Transformer Module topsides at Wallsend |
| In Construction | Offshore high-voltage station contractorNorther | Substation Electrical | Norther offshore high-voltage station |
| In Construction | Foundation secondary-steel supplierOranjeWind | Foundation Supply | Scope not set |
| In Construction | Foundation supplier and transition-piece engineering providerPrinses Amalia | Foundations | Q7 monopiles, transition pieces and J-tube solution |
| In Construction | Transition-piece fabricator and outfitterRentel | Foundations | 42 transition pieces |
| In Construction | Foundation fabricatorRhyl Flats | Foundations | Monopile foundations and transition pieces |
| In Construction | Offshore substation EPC joint venture partnerSaint-Brieuc | Substation Electrical | Engineering, procurement and construction of offshore substation |
| In Construction | Offshore substation steel structure fabricatorSaint-Brieuc | Substation Electrical | Offshore substation jacket foundation and topside steel structure |
| In Construction | Offshore high-voltage substation EPCI consortium memberSeamade (Mermaid) | Substation Electrical | Mermaid and Seastar high-voltage substations |
| In Construction | Transition-piece secondary steel and outfitting contractorSeamade (Mermaid) | Foundations | SeaMade transition pieces |
| In Construction | Offshore high-voltage substation EPCI consortium memberSeamade (SeaStar) | Substation Electrical | Seastar and Mermaid high-voltage substations |
| In Construction | Transition-piece secondary steel and outfitting contractorSeamade (SeaStar) | Foundations | SeaMade transition pieces |
| In Operation | Foundation maintenance providerThanet | Operations Maintenance | Thanet turbine foundations |
| In Construction | Offshore substation topside or jacket supplierThanet | Substation Electrical | Thanet offshore substation jacket and topsides |
| In Construction | Transition piece supplierThanet | Foundations | Transition pieces for Thanet wind turbine foundations |
| In Construction | Jacket assembly yardThorntonbank Phase 2 | Foundations | Steel jacket foundations for Phases 2 and 3 |
| In Construction | Jacket assembly yardThorntonbank Phase 3 | Foundations | Steel jacket foundations for Phases 2 and 3 |
| In Construction | TWB II monopile and transition-piece fabrication joint-venture partnerTrianel Windpark Borkum | Foundations | 32 monopiles and transition pieces for Trianel Windpark Borkum II |
| In Construction | Monopile and transition-piece engineering and manufacturing contractorTriton Knoll Wind Farm | Foundations | 90 turbine monopiles and transition pieces |
| In Construction | Offshore substation consortium memberVeja Mate | Substation Electrical | Veja Mate offshore substation |
| In Construction | Transition piece supplierYunlin | Foundations | 40 transition pieces for Yunlin |
| In Operation | Other | Onshore grid assets | Dogger Bank C · Onshore Conversion |
| In Operation | Other | Onshore grid assets | Dogger Bank C · Final Grid Connection Point |
| In Construction | Other | Onshore grid assets | Hornsea Project Three · Onshore Conversion |
| In Operation | Other | Onshore grid assets | Hornsea Project Three · Final Grid Connection Point |
| In Operation | Operator Or ApplicantNess point Wind Turbine 1 | Onshore wind | Ness point Wind Turbine 1 |
| In Operation | Other | Onshore grid assets | Saint-Brieuc · Final Grid Connection Point |
| In Operation | Operator Or ApplicantWind Farm Africa Alive | Onshore wind | Wind Farm Africa Alive |