| In Construction | Transition-piece fabricatorBaltic Eagle | Foundations | 50 transition pieces manufactured in Aviles |
| In Construction | Jacket foundation manufacturing partnerDieppe - Le Tréport | Foundation Supply | 62 jacket foundations for Dieppe-Le Tréport |
| In Construction | Pile fabricatorEast Anglia ONE | Foundations | East Anglia ONE foundation piles built in Aviles |
| In Construction | Transition piece supplier and monopile manufacturing partnerEast Anglia THREE | Foundation Supply | 95 transition pieces and 45 joint-venture monopiles for East Anglia THREE |
| In Construction | Floating foundation fabricatorHywind Scotland Pilot Park | Foundations | Spar floating foundations for the Hywind Scotland turbines |
| In Construction | Transition piece fabricatorMerkur Offshore | Foundations | Transition pieces for Merkur foundations |
| In Construction | FoundationsNissum Bredning | Foundations | Gravity-jacket foundations |
| In Construction | Pin pile fabricatorSaint-Brieuc | Foundations | Pin piles for 62 jacket foundations |
| In Construction | Foundation fabrication consortium partnerWikinger Offshore | Foundations | Navantia-Windar turbine jacket foundations |
| Consented | Monopile foundation manufacturerWindanker | Foundations | 21 monopile foundations for Windanker |
| In Construction | Transition piece manufacturerWindanker | Foundations | 21 transition pieces for Windanker |
| In Operation | Other | Onshore grid assets | East Anglia ONE · Intermediate Connection Asset |
| In Operation | Other | Onshore grid assets | East Anglia ONE · Final Grid Connection Point |
| In Operation | Other | Onshore grid assets | Saint-Brieuc · Final Grid Connection Point |