Waita geothermal power plant
Waita geothermal power plant geothermal power overview.
Waita geothermal power plant is an operational 2 MW geothermal power station in Japan.In OperationJapan
At a Glance
Installed capacity
2 MWTechnology
binary cycleUnits
2 (1 operating)Owner
Data coming soonCountry
JapanLocation
33.140°, 131.163°Ownership
Owner data coming soon.
Units
2 unitsEach generating unit at this station, as Global Energy Monitor records it.
| Unit | Technology | Capacity | Status | Start year |
|---|---|---|---|---|
| 1 | binary cycle | 2 MW | Operating | 2015 |
| 2 | binary cycle | 35.3 MW | Construction | 2026 |
Nearby
30 nearest · within 32 kmGeneration, storage and grid substations closest to Waita geothermal power plant, by straight-line distance.
- Oguni Machiokoshi geothermal power plantGeothermal power · 5 MWIn Operation1.5 km
- 玖珠郡九重町 Solar Facility (A743363H44)Solar · 10 MWIn Operation2.7 km
- Otake geothermal power plantGeothermal power · 15 MWIn Operation3.2 km
- Sugawara geothermal power plantGeothermal power · 5 MWIn Operation3.8 km
- Hatchobara geothermal power plantGeothermal power · 112 MWIn Operation4.4 km
- 阿蘇郡小国町 Solar Facility (A743618843)Solar · 10 MWIn Operation4.6 km
- Takigami geothermal power plantGeothermal power · 33 MWIn Operation13.0 km
- 玖珠郡九重町 Solar Facility (A751905H44)Solar · 16 MWIn Operation13.2 km
- 阿蘇郡小国町 Solar Facility (A751825H43)Solar · 15 MWIn Operation13.4 km
- 由布市 Solar Facility (A744369H44)Solar · 18 MWIn Operation16.8 km
- Matsubara Oita hydroelectric plantHydroelectric · 51 MWIn Operation17.0 km
- Kuju wind farmOnshore wind · 11 MWIn Operation17.7 km
- 玖珠郡玖珠町 Solar Facility (A776454H44)Solar · 8.2 MWIn Operation17.9 km
- 由布市 Solar Facility (A776456H44)Solar · 9.5 MWIn Operation18.4 km
- Substation · Main grid19.0 km
- 玖珠郡玖珠町 Solar Facility (A752075H44)Solar · 18 MWIn Operation22.0 km
- 日田市 Solar Facility (A877890H44)Solar · 10 MWIn Operation23.6 km
- Substation · Main grid24.3 km
- 菊池市 Solar Facility (A877702H43)Solar · 17 MWIn Operation26.4 km
- 大分市 Solar Facility (A744637H44)Solar · 30 MWIn Operation26.9 km
- Substation · Main grid27.5 km
- Substation · Main grid27.6 km
- 由布市 Solar Facility (A751797H44)Solar · 6.5 MWIn Operation27.7 km
- 別府市 Solar Facility (A777043H44)Solar · 20 MWIn Operation28.9 km
- Substation · 66 kV · Main grid30.5 km
- 菊池郡大津町 Solar Facility (A764380843)Solar · 23 MWIn Operation31.2 km
- 菊池郡大津町 Solar Facility (A960383H43)Solar · 19 MWIn Operation31.2 km
- 日田市 Solar Facility (A937919H44)Solar · 19 MWIn Operation31.2 km
- Yanagimata hydroelectric plantHydroelectric · 64 MWIn Operation31.7 km
- 菊池市 Solar Facility (A764417H43)Solar · 7.1 MWIn Operation31.8 km
Capacity history
Recorded project capacity figures. Future-dated changes are shown but are not used as current capacity.
| Effective | Capacity type | Capacity | Source |
|---|---|---|---|
| Current | Installed capacity | 2 MW | Global Integrated Power Tracker, September 2026 (V2): operating units |