| In Construction | Foundation installation vessel contractorAmrumbank West | Foundations | Monopile and transition-piece installation using MPI Discovery |
| In Construction | Turbine installation vessel contractorAmrumbank West | Transport Installation | 80-turbine installation campaign using MPI Adventure |
| In Construction | Foundation transport and installation contractorBaltic Eagle | Foundations | 50 monopiles installed with Svanen |
| In Construction | Inter-array cable transport and installation contractorBaltic Eagle | Cables | 66 kV inter-array cable system |
| In Construction | Offshore transportation and installation contractor for foundation componentsBaltic Power | Foundations | Baltic Power foundation component transport and installation |
| In Construction | Monopile foundation and offshore substation foundation installation contractorBaltica 2 | Foundations | Baltica 2 111 monopile offshore installation campaign |
| In Construction | Electrical infrastructure EPCI contractorBelwind | Substation Electrical | Offshore high voltage station and grid connection |
| In Construction | EPC balance-of-plant contractorBelwind | Epc Balance Of Plant | Foundations, power cables, OHVS and onshore grid connection |
| In Construction | Foundation EPCI contractorBelwind | Foundations | 56 monopile foundations and transition pieces |
| In Construction | Power cable EPCI contractorBelwind | Cables | 55 infield cables, export cable and onshore cable |
| In Construction | Electrical infrastructure EPCI contractorBelwind Haliade Demonstration | Substation Electrical | Offshore high voltage station and grid connection |
| In Construction | EPC balance-of-plant contractorBelwind Haliade Demonstration | Epc Balance Of Plant | Foundations, power cables, OHVS and onshore grid connection |
| In Construction | Power cable EPCI contractorBelwind Haliade Demonstration | Cables | 55 infield cables, export cable and onshore cable |
| In Construction | Balance of plant contractorBlauwwind | Epc Balance Of Plant | Foundations and inter-array cables |
| In Construction | Foundation installation contractorBlauwwind | Foundations | 77 monopile foundations |
| In Construction | Inter-array cable engineering and installation contractorBlauwwind | Cables | Borssele III & IV inter-array cables |
| In Construction | Inter-array cable installation contractorBorkum Riffgrund II | Cables | 110 km of inter-array and link cables |
| In Construction | Inter-array cable transport, installation and burial contractorBorssele I and II | Cables | 94 inter-array cables with total length of 167 km |
| Consented | Consortium sponsor and innovation developerBorssele V | Development | Two Towers consortium and Borssele V innovation programme |
| In Construction | Slip-joint foundation technology developerBorssele V | Foundations | Submerged slip-joint connection between monopile and transition piece |
| In Construction | Foundation installation contractorBurbo Bank Extension | Foundations | 32 monopile and transition piece foundations plus scour protection |
| In Construction | Balance of plant contractorCrossWind | Epc Balance Of Plant | Foundations, inter-array cables and turbine transport and installation |
| In Construction | Foundation installation contractorCrossWind | Foundations | 70 TP-less monopile foundations |
| In Construction | Inter-array cable installation contractorCrossWind | Cables | 69 inter-array cables totalling 140 km |
| In Construction | Turbine transport and installation contractorCrossWind | Transport Installation | 69 Siemens Gamesa turbines |
| In Construction | Balance of plant contractorDeutsche Bucht | Epc Balance Of Plant | Deutsche Bucht offshore construction package |
| In Construction | Foundation installation contractorDeutsche Bucht | Foundations | Monopile and Mono Bucket foundation installation |
| In Construction | Inter-array cable installation contractorDeutsche Bucht | Cables | More than 40 km of internal wind-farm cables |
| In Construction | Offshore substation handover contractorDeutsche Bucht | Substation Electrical | Deutsche Bucht offshore substation |
| In Construction | Foundation transport and installation main contractorEast Anglia ONE | Transport Installation | 102 jacket foundations |
| In Construction | Marine contractor for foundations, cables and turbinesEcowende | Epc Balance Of Plant | Ecowende offshore wind farm marine construction scope |
| In Construction | Monopile foundation installation contractorEcowende | Foundation And Marine Works | 52 monopile foundations for Ecowende |
| In Construction | Subsea rock installation contractorEmpire Wind 1 | Other | Empire Wind subsea rock installation |
| In Construction | EPC contractorGemini | Epc Balance Of Plant | Foundations, electrical infrastructure, cables and turbine installation |
| In Construction | Installation vessel providerGemini | Transport Installation | Aeolus turbine transport and installation vessel |
| In Construction | Export and array cable installation contractorGreater Changhua 1 - South East | Cables | Greater Changhua 1 & 2a export and array cable installation |
| In Construction | Inter-array and export cable installation contractorGreater Changhua 2a - South West | Cables | 111 inter-array cables and three export cables for Greater Changhua 1 & 2a |
| In Construction | Installation vessel providerKårehamn | Transport Installation | MPI Discovery jack-up vessel for foundations and turbines |
| In Construction | Foundation transport and installation contractorKriegers Flak | Foundations | 72 monopiles and transition pieces |
| In Construction | Installation vessel providerLondon Array | Marine Vessels Logistics | MPI Adventure jack-up vessel for deep-water installation work |
| In Construction | Offshore balance-of-plant contractorLuchterduinen | Epc Balance Of Plant | Foundations, electrical infrastructure and offshore transformer station |
| In Construction | Turbine installation vessel providerLuchterduinen | Transport Installation | Installation of 43 offshore wind turbines |
| In Operation | Monopile foundation transport and installation contractorNordsee Cluster A - N-3.7 | Foundation And Marine Works | 44 extended monopile foundations and secondary steel for Nordseecluster A |
| Consented | Monopile foundation transport and installation contractorNordsee Cluster A - N-3.8 | Foundation And Marine Works | Nordseecluster A extended monopile foundations and secondary steel |
| Consented | Offshore installation contractorNordsee Cluster B - N-3.5 | Foundation And Marine Works | Nordseecluster offshore installation works |
| Consented | Offshore installation contractorNordsee Cluster B - N-3.6 | Foundation And Marine Works | Nordseecluster offshore installation works |
| In Construction | Inter-array and export cable installation contractorNorther | Cables | 70 km inter-array cables and 26 km export cable |
| In Construction | Main balance-of-plant contractorNorther | Epc Balance Of Plant | Foundations, offshore high-voltage station, inter-array cables and export cable |
| In Construction | Turbine installation contractorNorther | Transport Installation | Installation of 44 MHI Vestas V164 turbines |
| In Construction | Cable installation and burial contractorPrinses Amalia | Cables | 33 kV infield cables, 150 kV export cable and cable burial |
| In Construction | EPC contractor for foundations, electrical infrastructure and scour protectionPrinses Amalia | Epc Balance Of Plant | Turbine foundations, infield/export cables, offshore high-voltage station and rock-fill scour protection |
| In Construction | Monopile foundation installation contractorRampion | Foundations | Monopile foundation installation |
| In Construction | Scour protection supply and installation contractorRampion | Transport Installation | Scour protection supply and installation |
| In Construction | Wind turbine installation contractorRampion | Transport Installation | Installation of Rampion wind turbines using MPI Discovery and MPI Adventure |
| In Operation | Major component exchange vessel contractorRhyl Flats | Operations Maintenance | Generator exchange on Siemens 3.6 MW turbine |
| In Construction | Jacket foundation transport and installation contractorSaint-Brieuc | Transport Installation | Transport and installation of 62 jacket foundations |
| In Construction | Turbine installation vessel contractorSandbank | Transport Installation | 72 Siemens SWT-4.0-130 turbines |
| In Construction | Scour protection installation contractorSheringham Shoal | Transport Installation | Rock installation at 79 scour-protection locations |
| In Operation | Monopile foundation and array cable EPCI contractorSofia | Foundation And Marine Works | 100 monopile foundations and inter-array cable package |
| In Construction | Foundation transport and installation contractorTaranto Offshore | Foundations | Ten monopile foundations |
| In Construction | Turbine transport and installation contractorTaranto Offshore | Transport Installation | Installation of ten MySE3.0-135 turbines using MPI Resolution |
| In Construction | Balance of plant contractorTeesside | Epc Balance Of Plant | Foundations, subsea cabling, scour protection and turbine installation support |
| In Construction | Foundation fabrication and installation contractorTeesside | Foundations | 27 monopile foundations and transition pieces |
| In Construction | Subsea cable design, supply and installation contractorTeesside | Cables | Approximately 18 km of subsea cabling |
| In Construction | Turbine installation partnerTeesside | Transport Installation | Installation of 27 Siemens turbines |
| In Construction | Turbine installation vessel providerThanet | Transport Installation | MPI Resolution turbine installation vessel |
| In Construction | Foundation transport and installation contractorWalney Extension | Foundations | Transport and installation of 87 monopile foundations and transition pieces |
| Consented | Foundation transport and installation plus inter-array cable contractorWindanker | Transport Installation | Windanker monopile foundation installation and inter-array cable work |
| In Construction | Balance of plant contractorWindpark Fryslân | Epc Balance Of Plant | Foundations, cables, turbine-installation equipment and nature island |
| In Construction | Cable design, supply and installation contractorWindpark Fryslân | Cables | Approximately 90 km of IJsselmeer cable and 55 km of onshore cable |
| In Construction | Foundation design, fabrication and installation contractorWindpark Fryslân | Foundations | 89 monopile foundations in the IJsselmeer |
| In Operation | Other | Onshore grid assets | Ecowende · Final Grid Connection Point |
| In Operation | Other | Onshore grid assets | Ecowende · Intermediate Connection Asset |
| Development | Other | Onshore grid assets | Nordsee Cluster B - N-3.5 · Onshore Conversion |
| In Operation | Other | Onshore grid assets | Nordsee Cluster B - N-3.5 · Final Grid Connection Point |
| In Operation | Other | Onshore grid assets | Saint-Brieuc · Final Grid Connection Point |