Marusumi Paper Ohe Mill power station
Marusumi Paper Ohe Mill power station bioenergy power overview.
Marusumi Paper Ohe Mill power station is an operational 35 MW bioenergy power station in Japan.In OperationJapan
At a Glance
Installed capacity
35 MWFuel
Paper mill wastesUnits
2 (1 operating)Owner
Marusumi Paper Co LtdCountry
JapanLocation
34.008°, 133.554°Ownership
1 record| Share | Organisation | Role | Details | Period |
|---|---|---|---|---|
| 100% | Marusumi Paper Co Ltd | Owner | Not set | Current / not dated |
Units
2 unitsEach generating unit at this station, as Global Energy Monitor records it.
| Unit | Fuel | Capacity | Status | Start year |
|---|---|---|---|---|
| Unit 4 | Paper mill wastes | 35 MW | Operating | 2013 |
| Unit 5 | Paper mill wastes | 51 MW | Shelved |
Nearby
30 nearest · within 48 kmGeneration, storage and grid substations closest to Marusumi Paper Ohe Mill power station, by straight-line distance.
- Marusumi Paper Ohe Mill power stationCoal power · 74 MWIn Operation0.0 km
- Daio Mishima Mill power stationBioenergy power · 63 MWIn Operation2.1 km
- Daio Mishima Mill power stationCoal power · 356 MWIn Operation2.1 km
- Substation · 187 kV · Main grid3.5 km
- 観音寺市 Solar Facility (A590287G37)Solar · 10 MWIn Operation11.5 km
- Substation · Main grid11.5 km
- Substation · 500 kV · Main grid16.4 km
- Substation · Main grid18.4 km
- Substation · Main grid18.4 km
- 新居浜市 Solar Facility (A571841G38)Solar · 48 MWIn Operation19.0 km
- Niihama Kita thermal power stationOil and gas power · 150 MWIn Operation22.3 km
- 三豊市 Solar Facility (A584912G37)Solar · 9.2 MWIn Operation27.4 km
- Sameura hydroelectric plantHydroelectric · 42 MWIn Operation28.0 km
- Niihama Nishi power stationCoal power · 300 MWIn Operation28.8 km
- Otoyo wind farmOnshore wind · 18 MWIn Operation30.1 km
- 仲多度郡まんのう町 Solar Facility (A602766G37)Solar · 8 MWIn Operation31.2 km
- 仲多度郡まんのう町 Solar Facility (A641160G37)Solar · 20 MWIn Operation31.2 km
- Hongawa pumped-storage power stationPumped hydro · 615 MWIn Operation33.1 km
- 西条市 Solar Facility (A564416G38)Solar · 14 MWIn Operation33.9 km
- 仲多度郡まんのう町 Solar Facility (A620263G37)Solar · 14 MWIn Operation34.7 km
- Saijo power stationCoal power · 750 MWIn Operation36.6 km
- 香美市 Solar Facility (A595695G39)Solar · 26 MWIn Operation39.3 km
- 香美市 Solar Facility (A602788G39)Solar · 7.3 MWIn Operation39.4 km
- Hirayama hydroelectric plantHydroelectric · 44 MWIn Operation40.7 km
- Nyugawa power stationCoal power · 250 MWIn Operation41.3 km
- 西条市 Solar Facility (A564417G38)Solar · 27 MWIn Operation41.3 km
- 西条市 Solar Facility (A561886G38)Solar · 23 MWIn Operation41.6 km
- Sakaide power stationOil and gas power · 1,385 MWIn Operation45.7 km
- 坂出市 Solar Facility (A567869G37)Solar · 9 MWIn Operation46.2 km
- Sakaide Biomass power stationBioenergy power · 75 MWIn Operation47.2 km
Capacity history
Recorded project capacity figures. Future-dated changes are shown but are not used as current capacity.
| Effective | Capacity type | Capacity | Source |
|---|---|---|---|
| Current | Installed capacity | 35 MW | Global Integrated Power Tracker, September 2026 (V2): operating units |