Saijo power station
Saijo power station coal power overview.
Saijo power station is an operational 750 MW coal-fired power station in Japan.In OperationJapan
At a Glance
Installed capacity
750 MWTechnology
Ultra-supercritical, SubcriticalUnits
3 (2 operating)Owner
Shikoku Electric Power Co., Inc.Country
JapanLocation
33.933°, 133.169°Ownership
1 record| Share | Organisation | Role | Details | Period |
|---|---|---|---|---|
| 100% | Owner | Not set | Current / not dated |
Units
3 unitsEach generating unit at this station, as Global Energy Monitor records it.
| Unit | Technology | Capacity | Status | Start year | Details |
|---|---|---|---|---|---|
| Unit 1 | Subcritical | 156 MW | Retired | 1965–2022 | Bituminous |
| Unit 1 Replacement | Ultra-supercritical | 500 MW | Operating | 2023 | |
| Unit 2 | Subcritical | 250 MW | Operating | 1970 | Bituminous |
Nearby
30 nearest · within 52 kmGeneration, storage and grid substations closest to Saijo power station, by straight-line distance.
- Substation · 187 kV · Main grid0.2 km
- Substation · 187 kV · Main grid0.8 km
- 西条市 Solar Facility (A564416G38)Solar · 14 MWIn Operation2.7 km
- Nyugawa power stationCoal power · 250 MWIn Operation4.9 km
- Substation · 187 kV · Main grid5.1 km
- Substation · 187 kV · Main grid5.2 km
- 西条市 Solar Facility (A561886G38)Solar · 23 MWIn Operation5.3 km
- 西条市 Solar Facility (A564417G38)Solar · 27 MWIn Operation5.3 km
- Substation · 187 kV · Main grid5.5 km
- Niihama Nishi power stationCoal power · 300 MWIn Operation7.8 km
- Niihama Kita thermal power stationOil and gas power · 150 MWIn Operation14.6 km
- 今治市 Solar Facility (A570136G38)Solar · 8 MWIn Operation15.5 km
- 新居浜市 Solar Facility (A571841G38)Solar · 48 MWIn Operation17.6 km
- Hongawa pumped-storage power stationPumped hydro · 615 MWIn Operation24.7 km
- 松山市 Solar Facility (A593475G38)Solar · 11 MWIn Operation30.2 km
- Daio Mishima Mill power stationBioenergy power · 63 MWIn Operation35.8 km
- Daio Mishima Mill power stationCoal power · 356 MWIn Operation35.8 km
- 松山市 Solar Facility (A579565G38)Solar · 7.5 MWIn Operation36.2 km
- Marusumi Paper Ohe Mill power stationBioenergy power · 35 MWIn Operation36.6 km
- Marusumi Paper Ohe Mill power stationCoal power · 74 MWIn Operation36.6 km
- Sameura hydroelectric plantHydroelectric · 42 MWIn Operation40.4 km
- Owatari hydroelectric plantHydroelectric · 33 MWIn Operation42.9 km
- 豊田郡大崎上島町 Solar Facility (A635638F34)Solar · 10 MWIn Operation43.8 km
- 松山市 Solar Facility (A595746G38)Solar · 8 MWIn Operation45.0 km
- Osaki power stationCoal powerDormant45.3 km
- Osaki CoolGen ProjectCoal power · 166 MWIn Operation45.4 km
- 観音寺市 Solar Facility (A590287G37)Solar · 10 MWIn Operation46.6 km
- 高岡郡佐川町 Solar Facility (A583771G39)Solar · 9.5 MWIn Operation48.5 km
- Takehara power stationCoal power · 1,300 MWIn Operation49.0 km
- Otoyo wind farmOnshore wind · 18 MWIn Operation51.0 km
Capacity history
Recorded project capacity figures. Future-dated changes are shown but are not used as current capacity.
| Effective | Capacity type | Capacity | Source |
|---|---|---|---|
| Current | Installed capacity | 750 MW | Global Integrated Power Tracker, September 2026 (V2): operating units |