| Planned | Selected turbine supplier contextAflandshage | Turbine Supply Context | Aflandshage planned turbine package |
| Decommissioned | Successor Siemens direct-drive turbine supplierAjos 1 | Turbine Supply | Repowered Ajos wind farm |
| Decommissioned | Successor Siemens direct-drive turbine supplierAjos 2-3 | Turbine Supply | Repowered Ajos wind farm |
| Decommissioned | Successor Siemens direct-drive turbine supplierAjos 4 | Turbine Supply | Repowered Ajos wind farm |
| Decommissioned | Successor Siemens direct-drive turbine supplierAjos 5 | Turbine Supply | Repowered Ajos wind farm |
| Decommissioned | Successor Siemens direct-drive turbine supplierAjos 6-7 | Turbine Supply | Repowered Ajos wind farm |
| Decommissioned | Successor Siemens direct-drive turbine supplierAjos 8-9-10-11 | Turbine Supply | Repowered Ajos wind farm |
| Decommissioned | Successor Siemens direct-drive turbine supplierAjos 8-9-10-11 | Turbine Supply | Repowered Ajos wind farm |
| In Construction | Turbine supplierAjos Repowering | Turbine Supply | Eight offshore Siemens SWT-130 3.3 MW turbines and five onshore Siemens SWT-113 3.2 MW turbines |
| In Construction | Full-scope turbine, foundation and transformer platform contractorAlbatros | Epc Balance Of Plant | 16 SWT-7.0-154 turbines, monopile foundations and Siemens Offshore Transformer Module |
| In Construction | Monopile foundation supplier and installerAlbatros | Foundations | Albatros monopile foundations |
| In Construction | Turbine supplier and installerAlbatros | Turbine Supply | 16 Siemens SWT-7.0-154 turbines |
| In Operation | Initial turbine maintenance contractorAmrumbank West | Operations Maintenance | 80 Siemens SWT-3.6-120 offshore wind turbines |
| In Construction | Turbine supply, installation and commissioning contractorAmrumbank West | Turbine Supply | 80 Siemens SWT-3.6-120 offshore wind turbines |
| In Operation | Initial turbine service and maintenance providerAnholt | Operations Maintenance | First five years of turbine service and maintenance |
| In Construction | Wind turbine supplierAnholt | Turbine Supply | 111 Siemens 3.6 MW SWT-3.6-120 offshore wind turbines |
| In Operation | Turbine service providerArkona | Operations Maintenance | Arkona SWT-6.0-154 turbine fleet |
| In Construction | Turbine supply, installation and commissioning contractorArkona | Turbine Supply | 60 SWT-6.0-154 offshore wind turbines |
| In Operation | Technology testing partnerAvedøre Holme | Other | SWT-3.6-120 long-blade turbine test programme |
| In Construction | Wind turbine supplierAvedøre Holme | Turbine Supply | Siemens SWT-3.6-120 offshore turbines |
| In Construction | Wind turbine supplierB-Wind | Turbine Supply | Combined BC-Wind development, including the former B-Wind and C-Wind sites |
| In Construction | 107 SG 14-222 offshore turbine supplierBaltica 2 | Turbine Supply | Baltica 2 107 turbine package |
| In Construction | Contracted turbine supplierBałtyk 2 | Turbine Supply | 50 offshore wind turbines rated at up to 14.4 MW for Bałtyk 2 |
| Consented | Wind turbine supplierBałtyk 3 | Turbine Supply | SG 14-236 DD turbines for MFW Baltyk II and MFW Baltyk III |
| In Operation | Turbine service and warranty providerBeatrice | Operations Maintenance | Operational Beatrice turbine service and waste handling under SWA |
| In Construction | Turbine supplier, installer and commissioning contractorBeatrice | Turbine Supply | 84 Siemens Gamesa 7 MW wind turbine generators |
| In Construction | 2019 Phase 1 turbine order and service agreementBen Tre 5 | Turbine Supply | No. 5 Thanh Hai 1 nearshore wind farm |
| Planned | Conditional Phase 2 turbine supplier referenceBen Tre 5 | Turbine Supply | No. 5 Thanh Hai 2 nearshore wind farm |
| Planned | Conditional turbine supply proposalBen Tre 5 | Turbine Supply Context | No. 5 Thạnh Hải 2 |
| Planned | Financing coordination referenceBen Tre 5 | Finance Insurance Legal | No. 5 Thanh Hai 1 nearshore wind farm financing discussions |
| In Construction | Wind turbine supplier referenceBinh Dai 1 | Turbine Supply | Binh Dai offshore wind project turbine package |
| In Operation | Turbine service and maintenance providerBorkum Riffgrund I | Operations Maintenance | 10-year turbine service and maintenance agreement |
| In Construction | Turbine supplierBorkum Riffgrund I | Turbine Supply | 78 Siemens Gamesa 4 MW offshore wind turbines |
| In Construction | Turbine supplier, installer and commissioning providerBorkum Riffgrund I | Turbine Supply | 78 Siemens SWT-3.6-120 / 4 MW-class turbines |
| In Construction | SG 11.0-200 DD offshore turbine supplierBorkum Riffgrund III | Turbine Supply | Borkum Riffgrund 3 83 turbine package |
| In Construction | Wind turbine supplierBorssele I and II | Turbine Supply | 94 Siemens Gamesa 8 MW offshore wind turbines |
| In Construction | Original hybrid project EPC and maintenance contractorBulgana Green Power Hub | Epc Balance Of Plant | Construction and maintenance arrangements for the whole hybrid project, including its wind farm and battery. |
| In Construction | Wind turbine generator supplierBurbo Bank | Turbine Supply | 25 Siemens 3.6 MW turbines |
| In Construction | Turbine EPCI and maintenance contractorButendiek | Turbine Supply | 80 Siemens SWT-3.6-120 offshore wind turbines |
| In Operation | Turbine service and O&M principalButendiek | Operations Maintenance | Butendiek turbine fleet and associated balance-of-plant O&M subcontracting |
| In Construction | Selected turbine supplierC-Wind | Turbine Supply | Shared BC-Wind project, including its B-Wind and C-Wind constituent areas |
| In Construction | 64 7 MW offshore wind turbine supplierCalvados | Turbine Supply | Calvados 64 turbine package |
| In Operation | Pilot turbine maintenance technician providerCoastal Virginia Offshore Wind Pilot Project | Operations Maintenance | CVOW pilot turbine operations and maintenance |
| In Operation | SWT-6.0-154 turbine supplierCoastal Virginia Offshore Wind Pilot Project | Turbine Supply | Two 6 MW Siemens Gamesa SWT-6.0-154 turbines for the CVOW pilot |
| In Operation | HELIX technology development partnerCrossWind | Research And Monitoring | HELIX offshore wind farm flow-control experiment |
| In Operation | Turbine service and maintenance providerCrossWind | Operations Maintenance | 15-year turbine service agreement |
| In Construction | Turbine supplierCrossWind | Turbine Supply | 69 SG 11.0-200 DD offshore wind turbines |
| In Construction | SG 14-222 DD turbine supplierCVOW Commercial | Turbine Supply | 176 offshore wind turbines for CVOW Commercial |
| In Operation | Turbine service partner and technician training partnerCVOW Commercial | Operations Maintenance | CVOW commercial turbine maintenance |
| In Operation | Initial turbine service and maintenance providerDanTysk | Operations Maintenance | DanTysk turbine service and maintenance |
| In Construction | Turbine supplierDanTysk | Turbine Supply | 80 SWT-3.6-120 turbines |
| In Construction | Wind turbine supplierDieppe - Le Tréport | Turbine Supply | 62 Siemens Gamesa 8 MW turbines for Dieppe-Le Tréport |
| In Operation | Long-term turbine operations and maintenance providerDong Hai 1 – Tra Vinh | Operations Maintenance | Tra Vinh Dong Hai 1 Siemens Gamesa turbine fleet |
| In Operation | Wind turbine supplierDong Hai 1 – Tra Vinh | Turbine Supply | 25 SG 5.0-145 turbines for Tra Vinh Dong Hai 1 |
| In Operation | Wind turbine generator service providerDudgeon | Operations Maintenance | Initial WTG operations and maintenance support for 67 Siemens 6 MW turbines |
| In Construction | Wind turbine generator supplierDudgeon | Turbine Supply | 67 Siemens 6 MW wind turbine generators |
| In Operation | Full-scope turbine service providerEast Anglia ONE | Operations Maintenance | 102 SWT-7.0-154 turbines and offshore service logistics |
| In Construction | Turbine supplierEast Anglia ONE | Turbine Supply | 102 Siemens Gamesa 7 MW offshore wind turbines |
| In Construction | Wind turbine generator supplierEast Anglia THREE | Turbine Supply | 95 SG 14-236 DD turbines for East Anglia THREE |
| Consented | Wind turbine generator supplierEast Anglia TWO | Turbine Supply | 64 offshore wind turbines for East Anglia TWO |
| In Construction | Wind turbine supplier and facility constructorEnBW Baltic 1 | Turbine Supply | 21 Siemens SWT-2.3-93 turbines |
| In Construction | Wind turbine generator supplierEnBW Baltic 2 | Turbine Supply | 80 Siemens SWT-3.6-120 turbines |
| In Operation | Turbine service and maintenance providerFécamp Offshore | Operations Maintenance | 15-year service contract for Fécamp turbines |
| In Construction | Wind turbine supplierFécamp Offshore | Turbine Supply | 71 SWT-7.0-154 offshore wind turbines |
| Consented | Preferred turbine supplier and service providerFEW Baltic II | Turbine Supply | 25 SG 14-236 DD turbines and service agreement for F.E.W. Baltic II |
| Consented | Selected wind turbine supplierFloating Power Plant - PLOCAN / Seaworthy / Multiplat 2 | Turbine Supply | 4.3 MW SWT-DD-120 turbine for the P-Demo wind-wave-H2 demonstrator |
| In Construction | Offshore wind turbine supplierFormosa 1 OWF | Turbine Supply | Two 4 MW demonstration turbines and twenty SWT-6.0-154 turbines for the 128 MW project |
| In Construction | Wind turbine supplier and long-term service providerFormosa 2 OWF | Turbine Supply | 47 SG 8.0-167 DD offshore wind turbines and 20-year full-service agreement |
| In Operation | SWT-7.0-154 turbine supplier referenceFujian Putian City Flat Bay Three | Turbine Supply | Fujian Putian City Flat Bay Three Zone C turbine fleet |
| In Construction | Wind turbine design, manufacture, installation and commissioning contractorGalloper | Turbine Supply | 56 Siemens Gamesa 6.3 MW turbines |
| In Construction | Blade and nacelle manufacturerGamesa 5MW Test Turbine | Turbine Supply | G128-5.0 MW blades manufactured in Aoiz and nacelle manufactured in Tauste |
| Planned | Prototype developerGamesa 5MW Test Turbine | Development | G128-5.0 MW offshore wind turbine prototype at Arinaga Quay |
| In Operation | Prototype operator and testing leadGamesa 5MW Test Turbine | Operations Maintenance | Commissioning and operational testing of the G128-5.0 MW prototype |
| In Operation | Successor OEM organisationGamesa 5MW Test Turbine | Operations Maintenance | Gamesa offshore turbine technology after the Siemens Gamesa merger |
| In Construction | Turbine OEM and supplierGamesa 5MW Test Turbine | Turbine Supply | One Gamesa G128 offshore prototype turbine |
| In Operation | Turbine operations and maintenance providerGemini | Operations Maintenance | Long-term service agreement for Gemini turbines through 2036 |
| In Construction | Wind turbine supplierGemini | Turbine Supply | 150 Siemens 4 MW turbines |
| Consented | Turbine supplier and long-term service providerGennaker | Turbine Supply | 63 SG 14-236 turbines and offshore long-term service for Gennaker |
| In Operation | Former turbine service and maintenance providerGlobal Tech I | Operations Maintenance | Global Tech I turbine maintenance |
| In Operation | Turbine service and maintenance providerGode Wind I | Operations Maintenance | Gode Wind I and II turbine service contract |
| In Construction | Turbine supplierGode Wind I | Turbine Supply | 55 Siemens 6.3 MW turbines for Gode Wind I |
| In Operation | Turbine service and maintenance providerGode Wind II | Operations Maintenance | Gode Wind I and II turbine service |
| In Construction | Turbine supplierGode Wind II | Turbine Supply | 42 Siemens 6 MW turbines for Gode Wind II within the Gode Wind I and II package |
| In Operation | Initial turbine service providerGode Wind 3 | Operations Maintenance | Gode Wind III five-year service agreement |
| In Construction | Turbine supplierGode Wind 3 | Turbine Supply | 23 SG 11-200 Direct Drive turbines |
| In Construction | Wind turbine supplier and service providerGreater Changhua 1 - South East | Turbine Supply | SG 8.0-167 DD offshore wind turbines for Greater Changhua 1 & 2a, including service agreement |
| In Construction | Offshore wind turbine supplier and service providerGreater Changhua 2a - South West | Turbine Supply | SG 8.0-167 DD offshore wind turbines for Greater Changhua 1 & 2a, including service agreement |
| In Construction | SG 14-236 DD wind turbine supplierGreater Changhua 2b & 4 | Turbine Supply | 66 Siemens Gamesa 14 MW wind turbines |
| In Operation | Turbine service and maintenance providerGreater Gabbard | Operations Maintenance | Scheduled servicing, troubleshooting, technical support and monitoring for 140 SWT-3.6-107 turbines |
| In Construction | Wind turbine generator supplierGreater Gabbard | Turbine Supply | 140 Siemens SWT-3.6-107 turbines |
| In Construction | Turbine supplierGunfleet Sands 1 | Turbine Supply | 48 Siemens SWT-3.6-107 turbines across Gunfleet Sands I/II |
| In Construction | Turbine supplierGunfleet Sands 2 | Turbine Supply | 48 Siemens SWT-3.6-107 turbines across Gunfleet Sands I/II |
| In Construction | Demonstration turbine supplier and technology partnerGunfleet Sands 3 Demonstration | Turbine Supply | Two Siemens 6 MW direct-drive offshore turbines |
| In Operation | SWT-4.0-130 turbine supplier referenceGuodian Zhoushan Putuo 6 Offshore Wind Farm | Turbine Supply | Guodian Zhoushan Putuo District 6-2 turbine fleet |
| In Construction | Wind turbine generator supplierGwynt y Môr | Turbine Supply | 160 Siemens SWT-3.6-107 turbines |
| Consented | SG 14-222 DD turbine supplier and service providerHai Long 2A | Turbine Supply | 73 turbines for Hai Long 2A, 2B and 3 including Hai Long 2A |
| In Construction | SG 14-222 DD turbine supplier and service providerHai Long 2B / 3 | Turbine Supply | 73 turbines for Hai Long 2A, 2B and 3 |
| Consented | Wind turbine supplierHai Sheng - Formosa IV | Turbine Supply | Hai Sheng - Formosa IV |
| In Construction | EPC consortium partnerHiep Thanh | Epc Balance Of Plant | Engineering, procurement and construction offering for Hiep Thanh |
| In Operation | Ten-year turbine operations and maintenance providerHiep Thanh | Operations Maintenance | Siemens Gamesa turbines at Hiep Thanh |
| In Construction | Wind turbine supplierHiep Thanh | Turbine Supply | 18 Siemens Gamesa SG 5.0-145 turbines / 78 MW nearshore project |
| In Construction | Turbine supplier and installerHohe See | Turbine Supply | 71 Siemens SWT-7.0-154 turbines |
| In Construction | Turnkey turbine and foundation main contractorHohe See | Epc Balance Of Plant | 71 SWT-7.0-154 turbines plus monopile-based foundations |
| In Construction | Wind turbine supplierHollandse Kust Zuid Holland III - IV | Turbine Supply | SG 11.0-200 DD turbines across Hollandse Kust Zuid 1-4 |
| In Construction | Wind turbine supplierHollandse Kust Zuid I–II | Turbine Supply | SG 11.0-200 DD turbines for Hollandse Kust Zuid |
| In Construction | Wind turbine supplierHorns Rev 2 | Turbine Supply | 91 SWT-2.3-93 offshore wind turbines |
| In Construction | Wind turbine supplierHornsea Project One | Turbine Supply | 174 7 MW wind turbines |
| In Construction | Offshore wind turbine supplierHornsea Project Three | Turbine Supply | 197 SG 14-236 offshore wind turbines power boosted to 15 MW, with 115 m blades |
| In Construction | Wind turbine supplierHornsea Project Two | Turbine Supply | 165 Siemens Gamesa 8 MW turbines |
| In Construction | Turbine supplierHywind Metcentre | Turbine Supply | One Siemens 2.3 MW turbine on floating spar foundation |
| In Construction | Offshore wind turbine supplierHywind Scotland Pilot Park | Turbine Supply | Five SWT-6.0-154 direct-drive offshore wind turbines |
| In Operation | Wind-turbine service providerHywind Scotland Pilot Park | Operations Maintenance | Hywind Scotland turbine maintenance |
| In Operation | Turbine service providerHywind Tampen | Operations Maintenance | Five-year turbine service and warranty agreement |
| In Construction | Turbine supplierHywind Tampen | Turbine Supply | 11 SG 8.0-167 DD floating offshore wind turbines |
| In Operation | Operations and maintenance service providerInner Dowsing | Operations Maintenance | Inner Dowsing |
| In Construction | Wind turbine supplier and service providerIshikari Bay New Port Offshore | Turbine Supply | 14 SG 8.0-167 DD offshore wind turbines and 15-year full-scope service agreement |
| In Construction | Offshore wind turbine supplier and installation leadJeonnam 1 | Turbine Supply | Ten Siemens Gamesa SG 10.0-193 DD turbines for Jeonnam 1 |
| In Operation | Offshore wind turbine supplierJiangsu Luneng Dongtai | Turbine Supply | 50 Siemens SWT-4.0-130 turbines at Jiangsu Luneng Dongtai |
| In Operation | Phase I turbine supplierJiangsu Rudong 150MW Offshore (Intertidal) Demonstration Wind Farm | Turbine Supply | Longyuan Rudong intertidal demonstration Phase I |
| In Construction | Recyclable blade technology supplierKaskasi | Turbine Supply | RecyclableBlade-equipped turbines at Kaskasi |
| In Construction | Turbine supplierKaskasi | Turbine Supply | 38 SG 9.0-167 DD offshore wind turbines |
| In Construction | Turbine supplierKriegers Flak | Turbine Supply | 72 SG 8.0-167 DD offshore wind turbines |
| In Operation | Offshore wind turbine supplier referenceLaoting Bodhi Island 300MW Demonstration | Turbine Supply | 75 Siemens SWT-4.0-130 turbines at Laoting Bodhi Island |
| In Construction | Electrical installation and cable works contractorLillgrund | Cables | Electrical installations including cable works |
| In Operation | Initial service and maintenance providerLillgrund | Operations Maintenance | Five-year service and maintenance agreement |
| In Construction | Wind turbine supplier and installerLillgrund | Turbine Supply | 48 Siemens 2.3 MW Mk II offshore wind turbines |
| In Operation | Long-term turbine service providerLincs | Operations Maintenance | Lincs turbines and shared Grimsby service operation |
| In Construction | Turbine supplier, installer and commissioning contractorLincs | Turbine Supply | 75 Siemens turbines for the 270 MW Lincs wind farm |
| In Operation | Turbine service providerLondon Array | Operations Maintenance | 175 Siemens 3.6 MW turbines |
| In Construction | Wind turbine generator supplierLondon Array | Turbine Supply | 175 Siemens 3.6 MW wind turbines |
| In Operation | SWT-4.0-130 turbine supplierLongyuan Putian Nanri Island 50MW Pilot project | Turbine Supply | Four Siemens SWT-4.0-130 turbines at Longyuan Putian Nanri Island 50MW Pilot project |
| In Operation | SWT-4.0-130 turbine supplier referenceLongyuan Putian Nanri Island I | Turbine Supply | Longyuan Putian Nanri Island I 400 MW build-out and Phase 2 listed turbines |
| In Operation | Operational marine control and turbine service supportLynn | Operations Maintenance | Lynn and Inner Dowsing operational marine control |
| In Operation | Regular turbine maintenanceLynn | Operations Maintenance | Lynn |
| In Construction | Turbine supplierLynn | Turbine Supply | 54 Siemens 3.6-107 turbines |
| In Operation | Blade overhaul customer/technical principalMeerwind Süd / Ost | Operations Maintenance | Meerwind turbine blade overhaul and upgrade campaign |
| In Operation | Maintenance partnerMeerwind Süd / Ost | Operations Maintenance | Meerwind Süd / Ost offshore wind farm |
| In Construction | Turbine supplier and service providerMoray West | Turbine Supply | 60 SG 14-222 DD offshore wind turbines with service agreement |
| In Operation | Turbine service and maintenance providerNeart na Gaoithe | Operations Maintenance | 54 Siemens Gamesa wind turbines and Eyemouth O&M base |
| In Construction | Wind turbine generator supplierNeart na Gaoithe | Turbine Supply | 54 Siemens Gamesa 8 MW turbines |
| In Construction | CablesNissum Bredning | Cables | Export and array cable-in-pipe concept |
| In Construction | FoundationsNissum Bredning | Foundations | Gravity-jacket foundation concept |
| In Construction | Turbine SupplyNissum Bredning | Turbine Supply | Four SWT-7.0-154 turbines |
| In Construction | Turbine, foundation and electrical system supplierNissum Bredning | Epc Balance Of Plant | Turn-key delivery and balance of plant |
| In Construction | Wind turbine supplierNoirmoutier | Turbine Supply | 61 Siemens Gamesa 8 MW turbines for EMYN |
| In Operation | Turbine manufacturerP.E. Arauco II - Etapas I y II | Turbine Supply | P.E. Arauco II - Etapas I y II |
| In Operation | SG 3.4-132 turbine supplierArauco II – Phases III and IV (PEA III) | Turbine Supply | P.E. Arauco II - Etapas III y IV |
| In Operation | Original equipment service context providerPori Offshore 1 | Operations Maintenance | Siemens offshore turbine platform used for the Pori pilot and later Tahkoluoto build-out |
| In Construction | Pilot turbine supplierPori Offshore 1 | Turbine Supply | One Siemens SWT-2.3-101 offshore wind turbine |
| In Operation | Turbine service providerPori-Tahkoluoto | Operations Maintenance | Service and maintenance of Tahkoluoto Siemens offshore wind turbines |
| In Construction | Turbine supplier, installer and commissioning contractorPori-Tahkoluoto | Turbine Supply | Ten Siemens SWT-4.0-130 / 4.2 MW offshore wind turbines |
| In Construction | Wind turbine generator supplierProvence Grand Large | Turbine Supply | Three 8.4 MW offshore wind turbines |
| In Operation | Turbine technology supplierPutian Pinghai Bay Phase II | Turbine Supply | 41 Siemens Gamesa-licensed 6 MW turbines at Putian Pinghai Bay Phase II |
| In Construction | Wind turbine supplierRace Bank | Turbine Supply | 91 Siemens Gamesa 6 MW turbines |
| In Construction | Turbine supplierRentel | Turbine Supply | 42 Siemens D7 7.35 MW offshore wind turbines |
| In Construction | SG 11.0-200 DD wind turbine supplierRevolution Wind | Turbine Supply | 65 11 MW turbines for Revolution Wind |
| In Operation | Turbine service and maintenance providerRhyl Flats | Operations Maintenance | 25 SWT-3.6-107 turbines |
| In Construction | Wind turbine generator supplierRhyl Flats | Turbine Supply | 25 Siemens 3.6 MW offshore wind turbines |
| In Operation | Turbine technical principal for blade campaignRiffgat | Operations Maintenance | Riffgat turbine blade maintenance campaign |
| In Operation | Bonus Energy successor turbine platform ownerRønland | Turbine Supply | Bonus Energy turbine platform after Siemens acquisition |
| In Operation | Turbine servicing contractorRønland | Operations Maintenance | Four southern Rønland turbines |
| In Construction | Turbine supplierSaint-Brieuc | Turbine Supply | 62 SG 8.0-167 offshore wind turbines |
| In Operation | Bonus Energy successor turbine platform ownerSamso | Turbine Supply | Bonus Energy turbine platform after Siemens acquisition |
| In Operation | Turbine service synergy providerSandbank | Operations Maintenance | Sandbank and DanTysk turbine service plan |
| In Construction | Turbine supplierSandbank | Turbine Supply | 72 SWT-4.0-130 turbines |
| In Operation | Turbine service and monitoring providerSeamade (Mermaid) | Operations Maintenance | 17-year logistics, remote monitoring and diagnostics support |
| In Construction | Turbine supplierSeamade (Mermaid) | Turbine Supply | 58 SG 8.0-167 DD turbines across SeaMade, including 28 Mermaid turbines |
| In Operation | Turbine service and monitoring providerSeamade (SeaStar) | Operations Maintenance | 17-year logistics, remote monitoring and diagnostics support |
| In Construction | Turbine supplierSeamade (SeaStar) | Turbine Supply | 58 SG 8.0-167 DD turbines across SeaMade, including 30 Seastar turbines |
| In Operation | Siemens SWT-4.0-130 turbine referenceShanghai Lingang Demonstration - 1&2 | Turbine Supply | Shanghai Lingang Demonstration - 1 |
| In Operation | Turbine service and maintenance providerSheringham Shoal | Operations Maintenance | Service and maintenance of the Sheringham Shoal wind farm turbines |
| In Construction | Wind turbine generator supplier and commissioning contractorSheringham Shoal | Turbine Supply | 88 Siemens 3.6 MW wind turbine generators |
| Consented | Preferred turbine supplier and capacity reservation partnerSinan Haesong 3 | Turbine Supplier Context | Haesong 1 and 3 offshore wind projects |
| In Construction | SG 14-222 DD turbine supplierSofia | Turbine Supply | 100 14 MW turbines for Sofia |
| In Operation | Wind turbine supplier and service agreement providerSouth Fork | Turbine Supply | 12 Siemens Gamesa SG 11.0-200 DD turbines at South Fork Wind |
| In Operation | Siemens SWT-4.0-130 turbine supplierSPIC Binhai North H1 | Turbine Supply | 25 Siemens SWT-4.0-130 turbines for SPIC Binhai North H1 |
| In Operation | Siemens SWT-4.0-130 turbine supplierSPIC Binhai North H2 | Turbine Supply | 100 Siemens SWT-4.0-130 turbines for SPIC Binhai North H2 |
| In Construction | Wind turbine supplierSunrise Wind (US) | Turbine Supply | Sunrise Wind Siemens Gamesa turbine package |
| In Operation | Turbine operations and maintenance providerTan Thuan PECC2 | Operations Maintenance | Ten-year service contract for Tan Thuan turbines |
| In Operation | Turbine operations and maintenance providerTan Thuan PECC2 | Operations Maintenance | Ten-year service contract for Tan Thuan turbines |
| In Operation | Wind turbine supplierTan Thuan PECC2 | Turbine Supply | SG 5.0-145 turbines for the Tan Thuan nearshore wind farm |
| In Operation | Wind turbine supplierTan Thuan PECC2 | Turbine Supply | SG 5.0-145 turbines for the Tan Thuan nearshore wind farm |
| In Operation | Initial turbine O&M providerTeesside | Operations Maintenance | Turbine operations and maintenance during the first five years of operation |
| In Construction | Turbine supplierTeesside | Turbine Supply | 27 Siemens 2.3 MW turbines |
| In Construction | Turbine supplierTetraSpar Demonstrator | Turbine Supply | One 3.6 MW direct-drive offshore wind turbine |
| In Construction | SG 14-236 DD turbine supplierThor | Turbine Supply | 72 offshore wind turbines for Thor |
| In Operation | Wind turbine supplier and maintenance providerTianjin Nangang | Turbine Supply | 18 Gamesa G132-5.0 MW turbines at Tianjin Nangang phase 1 |
| In Operation | TWB II turbine service providerTrianel Windpark Borkum | Operations Maintenance | Five-year full-scope service contract for 32 Senvion turbines |
| In Operation | Full-service turbine maintenance providerVeja Mate | Operations Maintenance | Veja Mate wind turbines |
| In Construction | Turbine supplier, installer and commissioning contractorVeja Mate | Turbine Supply | 67 Siemens SWT-6.0-154 turbines |
| In Construction | Wind turbine generator supplierVesterhav Nord | Turbine Supply | 21 Siemens Gamesa 8.4 MW turbines at Vesterhav Nord |
| In Construction | Wind turbine generator supplierVesterhav Syd | Turbine Supply | 20 Siemens Gamesa 8.4 MW turbines at Vesterhav Syd |
| In Construction | Turbine supplierWalney Phase 1 | Turbine Supply | 51 Siemens SWT-3.6MW turbines |
| In Construction | Turbine supplierWalney Phase 2 | Turbine Supply | 51 Siemens SWT-3.6-120 turbines |
| In Construction | Wind turbine generator supplierWalney Extension | Turbine Supply | 47 Siemens Gamesa 7 MW turbines |
| Planned | Reserved offshore wind turbine supplierWaterekke | Turbine Supply Context | Waterekke turbine supply reservation |
| Planned | Optional turbine capacity reservationWaterkant | Turbine Supply | Optional reservation of 19 turbines of 15.5 MW each |
| In Construction | Wind turbine generator supplierWest of Duddon Sands | Turbine Supply | 108 Siemens Wind Power SWP 3.6 MW turbines |
| In Operation | Long-term turbine maintenance providerWestermeerwind | Operations Maintenance | Minimum fifteen-year operation and maintenance term for the Westermeerwind turbines |
| In Construction | Turbine supplierWestermeerwind | Turbine Supply | 48 Siemens SWT-3.0-108 direct-drive turbines |
| In Construction | Wind turbine supplierWestermost Rough | Turbine Supply | 35 Siemens 6 MW direct-drive turbines |
| Consented | Wind turbine supplierWindanker | Turbine Supply | 21 SG 14-236 DD wind turbines for Windanker |
| In Operation | Long-term turbine service providerWindpark Fryslân | Operations Maintenance | 89 Siemens Gamesa turbines |
| In Construction | Onshore substation contractorWindpark Fryslân | Substation Electrical | Breezanddijk onshore transformer station |
| In Construction | Wind turbine generator supplierWindpark Fryslân | Turbine Supply | 89 SWT-DD-130 turbines, each 4.3 MW |
| In Construction | Offshore wind turbine supplier and long-term service providerYunlin | Turbine Supply | 80 SG 8.0-167 DD offshore wind turbines and 15-year service agreement for Yunlin |
| In Operation | Owner · 100%Gamesa 5MW Test Turbine | Ownership | Siemens Gamesa Renewable Energy is the successor owner/OEM for Gamesa's 5 MW offshore prototype turbine at Arinaga in Gran Canaria. |
| In Operation | OperatorAmberi - Satara wind farm | Onshore wind | Amberi - Satara wind farm |
| In Construction | Other | Onshore grid assets | B-Wind · Onshore Conversion |
| In Operation | Other | Onshore grid assets | B-Wind · Final Grid Connection Point |
| In Operation | Other | Onshore grid assets | East Anglia ONE · Intermediate Connection Asset |
| In Operation | Other | Onshore grid assets | East Anglia ONE · Final Grid Connection Point |
| In Operation | Other | Onshore grid assets | Gemini · Onshore Conversion |
| In Operation | Other | Onshore grid assets | Gemini · Final Grid Connection Point |
| In Operation | Other | Onshore grid assets | Gode Wind II · Onshore Conversion |
| In Operation | Other | Onshore grid assets | Gode Wind II · Final Grid Connection Point |
| In Operation | Other | Onshore grid assets | Gode Wind III · Onshore Conversion |
| In Operation | Other | Onshore grid assets | Gode Wind III · Final Grid Connection Point |
| In Operation | Other | Onshore grid assets | Greater Changhua 2a - South West · Final Grid Connection Point |
| In Operation | Other | Onshore grid assets | Hohe See · Onshore Conversion |
| In Operation | Other | Onshore grid assets | Hohe See · Final Grid Connection Point |
| In Operation | Other | Onshore grid assets | Inner Dowsing · Final Grid Connection Point |
| In Operation | Other | Onshore grid assets | Inner Dowsing · Intermediate Connection Asset |
| In Operation | Other | Onshore grid assets | London Array · Intermediate Connection Asset |
| In Operation | Other | Onshore grid assets | London Array · Final Grid Connection Point |
| In Operation | Other | Onshore grid assets | Meerwind Süd / Ost · Final Grid Connection Point |
| In Operation | Other | Onshore grid assets | Meerwind Süd / Ost · Onshore Conversion |
| In Operation | Other | Onshore grid assets | Neart na Gaoithe · Intermediate Connection Asset |
| In Operation | Other | Onshore grid assets | Neart na Gaoithe · Final Grid Connection Point |
| In Operation | OperatorNebrodi wind farm - Est | Onshore wind | Nebrodi wind farm |
| In Operation | OperatorNebrodi wind farm - Nord | Onshore wind | Nebrodi wind farm |
| In Operation | OperatorNebrodi wind farm - Ovest | Onshore wind | Nebrodi wind farm |
| In Operation | OperatorNMĐ gió Tân Thuận - GĐ 1 | Onshore wind | NMĐ gió Tân Thuận - GĐ 1 |
| In Operation | OperatorNMĐ gió Tân Thuận GĐ 2 | Onshore wind | NMĐ gió Tân Thuận GĐ 2 |
| In Operation | OperatorNMĐ gió Thái Hòa | Onshore wind | NMĐ gió Thái Hòa |
| In Operation | OperatorPISCO | Onshore wind | PISCO |
| In Operation | OperatorPISCO - SÃO GENES | Onshore wind | PISCO |
| In Operation | Other | Onshore grid assets | Saint-Brieuc · Final Grid Connection Point |
| In Operation | Other | Onshore grid assets | Sofia · Final Grid Connection Point |
| In Operation | Other | Onshore grid assets | Sofia · Onshore Conversion |
| Planning | Other | Onshore grid assets | Waterekke · Onshore Conversion |
| Planning | Other | Onshore grid assets | Waterekke · Final Grid Connection Point |
| In Operation | Other | Onshore grid assets | Westermeerwind · Intermediate Connection Asset |
| In Operation | Other | Onshore grid assets | Westermeerwind · Final Grid Connection Point |
| In Operation | Other | Onshore grid assets | Westermeerwind · Intermediate Connection Asset |